Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

16th St, 17th St, and 18th St Pavement Renovation

0% in published scope

Public Works · Repaving · Planning · Starts 30 Aug 2033, ends 13 Nov 2034

Early enough to change: Public Works gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

2 of the project's 10 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
16th St, 17th St, 18th St, Connecticut St, Kansas St, Vermont St
Planned bikeway
Separated bikeway, 0.85 mi on 17th St
Level 3 shared street, 0.18 mi on Connecticut St
Shared street, 0.18 mi on Kansas St
Would reach
1,230 residents (2020 census), 2 schools, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 1,001 residents with none within about one block (440 feet) today would have one; 922 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
None published.
Dates
StartEnd
Public consultationnot publishednot published
ConstructionAug 2033Nov 2034
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

7 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029203020312032203320342035today16th St, 17th St, and 18th St Paveme…PW Various Locations Sewer Replaceme…PW As Needed Spot Sewer Replacement …WD-2877 As Needed Water Main Replace…WD-2919: 8- and 12-Inch Ductile Iron…Various Locations Sewer Replacement …PW Various Locations Sewer Replacement No 16: construction 8 Sep 2025 to 9 Feb 2027PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026WD-2877 As Needed Water Main Replacement No.3: construction 1 Jan 2026 to 1 Jan 2029WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 2027Various Locations Sewer Replacement No 29: construction 12 Jun 2027 to 13 Dec 202816th St, 17th St, and 18th St Pavement Renovation: construction 30 Aug 2033 to 13 Nov 20348 Sep 2025 – 9 Feb 202722 Sep 2025 – 26 Oct 20261 Jan 2026 – 1 Jan 202913 Apr 2026 – 9 Dec 202712 Jun 2027 – 13 Dec 202830 Aug 2033 – 13 Nov 2034

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.