Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 40
0% in published scope
Public Works · Sewer, water or power · Design · Starts 4 Aug 2028, ends 4 Aug 2029
1 of the project's 2 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 23rd St, Alvarado St, Baden St, Blanche St, Brazil Ave, Cayuga Ave
- Planned bikeway
- Shared street, 0.36 mi on Hearst Ave, San Juan Ave
- Scope
- “2693i”
- Dates
Start End Public consultation not published not published Construction Aug 2028 Aug 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2874, 8- and 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets; approv…24 Mar 2026 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WD-2874, 8-Inch & 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets, to the responsible bidder that submitted the lowest respons…14 Nov 2023 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 10 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 10 shared street segments
- Slow StreetsSFMTA · Construction · 3 shared street segments
- Street Resurfacing Program-BBSR Paving FY 27-28Public Works · Planning · 2 shared street segments
- Silver Ave Pavement RenovationPublic Works · Planning · 2 shared street segments
- Cayuga Avenue Slow StreetSFMTA · Detailed Design · 2 shared street segments
- Various Locations Pavement Renovation No 101Public Works · Planning · 1 shared street segment
- PW Various Locations Sewer Replacement No 18Public Works · Construction · 1 shared street segment
How we built this: About the Data