Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Contract 36 Traffic Signal Modifications
Not stated
SFMTA · Bike, walk or safety · Implementation / Construction · Under way, ends 31 May 2026
10 of the project's 14 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- 7th Ave, Howard St, 17th St, Presidio Ave, 22nd St, Kirkham St
- Planned bikeway
- Bikeway of undecided type, 0.79 mi on 17th St, Presidio Ave, 22nd St
Separated bikeway, 0.79 mi on Howard St, 7th Ave, Turk Blvd
Shared street, 0.49 mi on 7th Ave, Kirkham St - Would reach
- 512 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 10 street segments that lack one. Closer in: 2,893 residents, 1 school with none within about one block (440 feet) today would have one; 715 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Spring 2024 - Spring 2026 May 2026 - Sources disagree
- Public Works' page gives its status as In progress; SFMTA's project layer gives Implementation / Construction.
The published end date, 2026-05-31, has passed; SFMTA's project layer still gives it as Implementation / Construction. - Records
- SFMTA project page · Public Works project page (Traffic Signal Modifications Contract #36)
City decisions naming this project
- Contract No. 36 Traffic Signal Modifications, Contract ID No. 1000031023 Contract Modification24 Jun 2024 · Public Works Commission
- Traffic Signal Modifications No. 36 – Contract Award6 Oct 2023 · Public Works Commission
3 milestones and events from the project's own page
- ConstructionSpring 2024 - Spring 2026 · Project page timeline · Pending
- Solicit Bids from ContractorsSummer 2023 - Spring 2024 · Project page timeline · Completed
- DesignSpring 2020 - Summer 2023 · Project page timeline · Completed
27 decisions on the same streets, not naming this project
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, west side, from 35 feet to 87 feet north of 21st Street (52-foot station) (Supervisor District 9) (Approvable by the City Traffic Eng…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications ESTABLISH – LEFT LANE MUST TURN LEFT – Howard Street, westbound, from …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- Approving parking and traffic modifications along 17th Street between Potrero Avenue and Mississippi Street to improve transportation safety and connectivity5 Mar 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240305-020)
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – CLASS IV BIKEWAY 17th Street, eastbound and westbound, between Potrero Avenue and Mississippi Street (Approvable by the City Traffic Engineer) 4(b). ESTABLISH – STOP SIGNS 17th Street, eastbound and westbound…1 Sep 2023 · Engineering hearing · Item 4(a) corrected to reflect approvability by the City Traffic Engineer. Item 4(c) updated to TOW AWAY NO STOPPING ANY TIME as originally proposed. Items 4(a) through 4(s) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approving various routine parking and traffic modifications on Pine Street, Sutter Street, and Page Street18 Oct 2022 · SFMTA Board · ADOPTED — 5 ayes (Resolution 221018-094)
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Amending Transportation Code, Division II, Sections 601 and 602, to designate full-time transit-only areas along the 43 Masonic and 44 O’Shaughnessy transit lines on Presidio Avenue, southbound, from Bush Street to Sutt …18 Jan 2022 · SFMTA Board
- Accept work performed by Ronan Construction, Inc. for Contract No. WW-671(I), Fillmore and Haight Street Intersection, AWSS, Pavement, and Sewer Replacement; approve Modification No. 5 (Final), increasing the contract am…28 Sep 2021 · SFPUC Commission · approve the Consent Calendar items 9a and 9c
- Accept work performed by Mitchell Engineering for Contract No. WD-2719, 8-Inch Ductile Iron Pipe and 12-Inch Earthquake Resistant Ductile Iron Pipe Water Main Installation on 22nd Street from Fair Oaks Street to Hampshir…24 Aug 2021 · SFPUC Commission · approve Item 10
- Accept work performed by Cratus, Inc. for Contract No. WD-2614, 8-Inch Ductile Iron Water Main Replacement on Green Street from Gough Street to Broderick Street; approve Modification No. 2 (Final), decreasing the contrac…8 Jun 2021 · SFPUC Commission · approve the Consent Calendar 8a through 8e
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 3rd Street, east side, from 390 feet to 420 feet north of 23rd Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Pallavi Panyam, [staff email removed…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of 17 calendar days to the contract duration contingency for Contract No. WW-671(I), Fillmore and Haight Street Intersection, AWSS, Pavement, and Sewer Replacement, with Ronan Construction, Inc.; and …23 Mar 2021 · SFPUC Commission · approve Consent Calendar items 9a, 9b, and 9d
- Amending Transportation Code, Division II, Section 702 to reduce the speed limit on Market Street between Franklin Street and Steuart Street - designate a transit-only lane on Market Street RESCIND - RIGHT TURN ONLY, EXC…19 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes, 2 nays
- Approving temporarily prohibiting the use of northbound 4th Street between Berry and Channel Streets by all vehicles other than transit, buses, bicycles, taxis, and emergency vehicles; directing the City Traffic Engineer…5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes
- Approving the following traffic modifications 102 A. ESTABLISH –TOW-AWAY, NO PARKING ANYTIME –Howard Street, north side, from Beale Street to 51 feet westerly5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes (Resolution 210105-002)
- ESTABLISH – TRAFFIC SIGNAL 9th Street, Division Street, and San Bruno Avenue (Supervisor Districts 6 and 10) Corbin Skerrit, [staff email removed — see the order] The proposed modification would install a new traffic sig…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to the SFMTA Board for approval and implementation.
- RESCIND - GENERAL METER PARKING, 1-HOUR TIME LIMIT, 9 AM TO 6 PM, MONDAY THROUGH SATURDAY 3rd St, west side, from 82 feet south to 102 feet south of Bayview Ave Sustainable Streets Division 10(b). ESTABLISH - NO PARKING …12 Jun 2020 · Engineering hearing · On hold pending further community outreach. Public Comments: Comments received in support and opposition.
- Ordinance approving a major encroachment permit for Laurel Heights Partners, LLC (“Permittee”) to occupy portions of Presidio Avenue, Masonic Avenue, Pine Street, Euclid Avenue, Mayfair Drive, and Laurel Street adjacent …19 Nov 2019 · Board of Supervisors · Passed
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
- Amending the Transportation Code, Division II, Section 601 to create a Muni only lane on Essex Street ESTABLISH – NO LEFT TURN EXCEPT BUSES, TAXIS, AND BIKES - Folsom Street16 Jul 2019 · SFMTA Board · ADOPTED — 6 ayes
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Brannan Street Safety ProjectSFMTA · Completed · 7 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 6 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 6 shared street segments
- Folsom-Howard Streetscape ProjectSFMTA · Current · 5 shared street segments
- Division/13th Street Safety ProjectSFMTA · Completed · 4 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 4 shared street segments
- 7th St, 8th St and Folsom St Pavement RenovationPublic Works · Planning · 3 shared street segments
- Various Locations Sewer Replacement No 28Public Works · Design · 2 shared street segments
How we built this: About the Data