Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 78
0% in published scope
Public Works · Repaving · Design · Under way, ends 31 Mar 2027
11 of the project's 14 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 34th Ave, 38th Ave, Ashbury St, Baker St, Birch St, Broderick St
- Planned bikeway
- Separated bikeway, 1 mi on Oak St
Shared street, 0.72 mi on 34th Ave, Golden Gate Ave - Would reach
- 749 residents (2020 census), 3 schools, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 11 street segments that lack one. Closer in: 2,195 residents with none within about one block (440 feet) today would have one; 1,437 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Mar 2026 March 2027 - Sources disagree
- The coordination feed gives construction ending 2027-06-12; Public Works' project page (Completion “Spring, 2027”; text “March 2027”), 2027-03-31, which is shown.
The start date has passed (2026-03-30) while the phase is still Design, per the coordination feed. - Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Various Locations Pavement Renovation No. 78 and Sewer Replacement – Contract Award13 Nov 2025 · Public Works Commission
11 decisions on the same streets, not naming this project
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- RESCIND – CLASS III BIKE LANE Baker Street, southbound, from Fell Street to Oak Street 38(b). RESCIND – ANGLED PARKING ESTABLISH – PARALLEL PARKING Baker Street, west side, between Oak Street and Fell Street 38(c). ESTAB…8 Nov 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- RESCIND – CLASS III BIKE LANE Baker Street, southbound, from Fell Street to Oak Street 8(b). RESCIND – ANGLED PARKING ESTABLISH – PARALLEL PARKING Baker Street, west side, between Oak Street and Fell Street 8(c). ESTABLI…18 Oct 2024 · Engineering hearing · Item withdrawn by staff.
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- Accept work performed by Trinet Construction, Inc. for Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair; approve Modification No. 1 (Final) decreasing the Contract amoun…23 Jan 2024 · SFPUC Commission · approve items 7a through 7i
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- Award Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair, in the amount of $566,000, and with a duration of 240 consecutive calendar days, to the responsible bidder that s…10 Jan 2023 · SFPUC Commission · Approve Consent Calendar Items 6a through 6j
- ESTABLISH – SIDEWALK BIKE SHARE STATION 38th Avenue, west side, from 12 feet to 79 feet south of Balboa Street (67-foot bike share station) (Supervisor District 1) Project Contact: Laura Stonehill, [staff email removed —…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Resolution granting revocable permission to 555 Fulton Street Development, LLC to construct and maintain encroachments in the public right-of-way, including but not limited to stamped asphalt on the roadway of Birch Stre…Undated · Board of Supervisors · Pending Committee Action
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Oak Street Quick-Build ProjectSFMTA · 20 shared street segments
- PW Various Locations Sewer Replacement (JV VL PR No 78)Public Works · Design · 9 shared street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 7 shared street segments
- Octavia Boulevard Enhancement ProgramSFMTA · Current · 2 shared street segments
- Mission, 8th, 9th, Howard and Natoma Brick Sewer RehabilitationPublic Works · Construction · 1 shared street segment
- Better Market StreetSFMTA · Current · 1 shared street segment
- Various Locations Sewer Replacement No 29Public Works · Design · 1 shared street segment
- PW Various Locations Sewer Replacement No 16Public Works · Construction · 1 shared street segment
How we built this: About the Data