Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
As Needed Citywide Pavement Preservation Contract 5 (General As-Needed Contract G23)
0% in published scope
Public Works · Spot repairs · Construction · Under way, ends 20 Jun 2028
All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 26th Ave, 31st Ave, 42nd Ave, 45th Ave, Blackstone Ct, Clay St
- Planned bikeway
- Shared street, 0.23 mi on Rivera St
Level 3 shared street, 0.068 mi on Eugenia Ave - Would reach
- 7,611 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 4,595 residents with none within about one block (440 feet) today would have one; 7,393 residents, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- “1908I”
- Dates
Start End Public consultation not published not published Construction Jun 2023 Jun 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
- As-Needed Citywide Pavement Preservation Contract 5 (General As-neededContract G23) – Contract Award5 May 2023 · Public Works Commission
9 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Clay Street, north side, from Davis Street to 66 feet westerly (Supervisor District 3) (Approvable by the City Traffic Engineer)12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Clay Street, south side, from 20 feet to 120 feet east of Battery Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura Stonehill, [staff email removed — s…19 Jul 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 26th Avenue, west side, from Clement Street to 50 feet southerly (Supervisor District 1) (Approvable by the City Traffic Engineer) Daniel Mackowski, …18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 45th Avenue, east side, from Noriega Street to 64 feet southerly (53-foot bike share station with red zones on each side of the station) (Supervisor …6 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Clay Street, south side, from 138 feet to 206 feet east of Lyon Street (63-foot bike share station in parking lane with red zones on either side) (Su…3 Jun 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 45th Avenue, east side, from Noriega Street to 64 feet southerly (53-foot bike share station with red zones on each side of the station) (Supervisor …18 Feb 2022 · Engineering hearing · Item withdrawn.
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 4 shared street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 2 shared street segments
- Taraval St & 47th Aveother · Planning · 2 shared street segments
- Second Street Improvement ProjectSFMTA · Completed · 1 shared street segment
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 1 shared street segment
- Slow StreetsSFMTA · Construction · 1 shared street segment
How we built this: About the Data