Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Sloat Blvd Quick-Build Project
Builds 46%
SFMTA · Bike, walk or safety · Detailed Design · Under way, ends 31 Dec 2025
2 of the project's 7 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.92 mi of the plan's bikeway.
- Streets
- Sloat Blvd
- Planned bikeway
- Separated bikeway, 2 mi on Sloat Blvd
- Scope
- None published.
- Dates
Start End Public consultation Winter - Early Summer 2023 Winter - Early Summer 2023 Construction Fall 2025 mid-December 2025 - Sources disagree
- The start date has passed (2025-10) while the phase is still Detailed Design, per SFMTA's project layer.
The published end date, 2025-12-31, has passed; SFMTA's page still gives it as Legislated; SFMTA's project layer still gives it as Detailed Design. - Not yet checked
- The construction end shown, 2025-12-31, was read from the words “mid-December 2025” on SFMTA's project page by a model, and a person has not confirmed it.
- Records
- SFMTA project page
City decisions naming this project
- ESTABLISH – CLASS IV BIKEWAY Sloat Boulevard, eastbound and westbound, from 47th Avenue to Skyline Boulevard (two-way protected bikeway on south side of roadway)* 10(b). RESCIND – CLASS II BIKEWAY Sloat Boulevard, eastbo…16 Jun 2023 · Engineering hearing · Lengthened and relocated taxi zone and adjusted passenger loading and blue zone locations based on public hearing feedback. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
6 milestones and events from the project's own page
- EvaluationSpring 2026 · Project page timeline · Pending
- ImplementationFall 2025 · Project page timeline · Completed
- OutreachWinter - Early Summer 2023 · Project page timeline · Completed
- Engineering Public Hearing Meeting, June 16, 202316 Jun 2023 · Project page event
- Sloat Boulevard Quick-Build Project Virtual Open House24 Apr 2023 · Project page event
- Approvals2023-2024 · Project page timeline · Completed
8 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Sloat Boulevard, south side, from 47th Avenue to 57 feet westerly (in the buffer adjacent to the two- way bikeway) (Supervisor District 7) (Approvabl…12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Sloat Boulevard, north side, from 10 feet to 20 feet east of 45th Avenue (Supervisor District 4 and 7) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email …17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 45th Avenue, east side, from Noriega Street to 64 feet southerly (53-foot bike share station with red zones on each side of the station) (Supervisor …6 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 45th Avenue, east side, from Noriega Street to 64 feet southerly (53-foot bike share station with red zones on each side of the station) (Supervisor …18 Feb 2022 · Engineering hearing · Item withdrawn.
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Authorize the General Manager to execute a Project Partnership Agreement with the Army Corps of Engineers (ACOE) for the construction of the Ocean Beach Beneficial Use of Dredged Materials Project to place sand dredged f…23 Feb 2021 · SFPUC Commission · approve Consent Item 22
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 8 shared street segments
- Geneva Ave and Sloat Blvd Pavement RenovationPublic Works · Planning · 7 shared street segments
- Sloat and Skyline Intersection ImprovementSFMTA · Completed · 2 shared street segments
- Contract 65 New Traffic SignalsSFMTA · Legislated · 2 shared street segments
- Lincoln and Sloat Quick-Build Connections ProjectSFMTA · 1 shared street segment
- Great Highway Pilot ProjectSFMTA · Completed · 1 shared street segment
How we built this: About the Data