Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation Concrete No 97
0% in published scope
Public Works · Repaving · Planning · Starts 28 Feb 2034, ends 14 May 2035
All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Bowdoin St, Brunswick St, Brussels St, Dartmouth St, Delta St, Elliot St
- Planned bikeway
- Separated bikeway, 0.27 mi on Mansell St
Shared street, 0.12 mi on Brunswick St - Would reach
- 5,078 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 3,211 residents, 1 school with none within about one block (440 feet) today would have one; 4,714 residents, 2 schools with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Feb 2034 May 2035 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
6 other projects on these street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 12 shared street segments
- WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various LocationsSFPUC · Design · 7 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 4 shared street segments
- 8-Inch Ductile Iron Water Main Replacement on Harkness, Goettingen, Brussels, Girard Streets and Various StreetsPublic Works · Design · 2 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 1 shared street segment
- San Bruno Ave Multimodal Improvement ProjectSFMTA · Implementation / Construction · 1 shared street segment
How we built this: About the Data