Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Market St from Octavia St to Castro St Pavement Renovation
0% in published scope
Public Works · Repaving · Planning · Starts 29 May 2031, ends 10 Aug 2032
13 of the project's 15 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 14th St, 15th St, 16th St, Buchanan St, Dolores St, Guerrero St
- Planned bikeway
- Separated bikeway, 2.4 mi on Market St
- Would reach
- 483 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 13 street segments that lack one. Closer in: 1,609 residents with none within about one block (440 feet) today would have one; 514 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction May 2031 Aug 2032 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
9 decisions on the same streets, not naming this project
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 14th Street, north side, from 37 feet to 53 feet east of Woodward Street (for 16-foot corral) 12(b). RESCIND – RED ZONE 14th Street, north side, from Woodward Street to 10…4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Market Street, north side, from 47 feet to 107 feet east of Bush Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura Stonehill, [staff email removed — se…19 Jul 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANYTIME, EXCEPT BICYCLES Octavia Street, east side, from 15 feet to 25 feet south of Oak Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Carmen Leung, [staff email removed …14 Jun 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Buchanan Street, east side, from 22 feet to 85 feet north of Lombard Street (63-foot station) (Supervisor District 2) (Approvable by the City Traffi…22 Sep 2023 · Engineering hearing · On hold pending exploration of a Moscone Park site as requested by the Supervisor.
- ESTABLISH – NO RIGHT TURN, EXCEPT BICYCLES Market Street, eastbound, at Church Street (Approvable by the City Traffic Engineer) 10(b). ESTABLISH – TYPE IV BIKE LANE Church Street, southbound, from Market Street to 200 fe…7 Jul 2023 · Engineering hearing · Item 10(a) approved by the City Traffic Engineer for implementation. Item 10(b) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Accept work performed by Cratus, Inc. under Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street, for a total contract amount of $15,404,492, and with …27 Jun 2023 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Amending Transportation Code, Division II, Section 702 to reduce the speed limit on Market Street between Franklin Street and Steuart Street - designate a transit-only lane on Market Street RESCIND - RIGHT TURN ONLY, EXC…19 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes, 2 nays
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Upper Market Street Safety ProjectSFMTA · Implementation / Construction · 4 shared street segments
- Octavia Boulevard Enhancement ProgramSFMTA · Current · 3 shared street segments
- Various Locations Sewer Replacement No 29Public Works · Design · 1 shared street segment
- PW MTA New Castro Station ElevatorPublic Works · Construction · 1 shared street segment
- Bikeway HardeningSFMTA · Planning · 1 shared street segment
- Mission District Sewer Rehabilitation (VLLD2B)Public Works · Design · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Better Market StreetSFMTA · Current · 1 shared street segment