SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets

0% in published scope

SFPUC · Sewer, water or power · Planning · Starts 1 Dec 2028, ends 30 Jun 2030

Early enough to change: SFPUC gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
25th St, 26th St, 27th St, Castro St, Cesar Chavez St, Clipper St
Planned bikeway
Shared street, 0.6 mi on Clipper St, Diamond St
Would reach
1,126 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,111 residents with none within about one block (440 feet) today would have one; 738 residents with none within about two blocks (880 feet) today would have one
Scope
“8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionDec 2028Jun 2030
Records
Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

6 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029203020312032today2021-003 8-inch Ductile Iron Water M…PW As Needed Spot Sewer Replacement …Various Locations Sewer Replacement …Various Locations Pavement Renovatio…PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026Various Locations Sewer Replacement No 28: construction 1 Mar 2027 to 21 Aug 2028Various Locations Pavement Renovation No 99: construction 28 Mar 2030 to 10 Jun 20312021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets: construction 1 Dec 2028 to 30 Jun 203022 Sep 2025 – 26 Oct 20261 Mar 2027 – 21 Aug 20281 Dec 2028 – 30 Jun 203028 Mar 2030 – 10 Jun 2031

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

6 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.