Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
2021-003 8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets
0% in published scope
SFPUC · Sewer, water or power · Planning · Starts 1 Dec 2028, ends 30 Jun 2030
All 3 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 25th St, 26th St, 27th St, Castro St, Cesar Chavez St, Clipper St
- Planned bikeway
- Shared street, 0.6 mi on Clipper St, Diamond St
- Would reach
- 1,126 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,111 residents with none within about one block (440 feet) today would have one; 738 residents with none within about two blocks (880 feet) today would have one
- Scope
- “8-inch Ductile Iron Water Main Replacement on Diamond St from 25th to 27th Street and Various Side Streets”
- Dates
Start End Public consultation not published not published Construction Dec 2028 Jun 2030 - Records
- Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
6 decisions on the same streets, not naming this project
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- Award Contract No. WD-2765, 8-Inch and 16-Inch Ductile Iron Water Main Replacement on Jersey Street from Douglass Street to Church Street and Various Street Locations, to the responsible bidder that submitted the lowest …9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- Accept work performed by Cratus, Inc. under Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street, for a total contract amount of $15,404,492, and with …27 Jun 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – RED ZONE A. 25th Street, south side, from Connecticut Street to 29 feet easterly (removes 1 parking space) B. 25th Street, south side, from 184 feet to 306 feet east of Connecticut Street (removes 6 parking s…8 Jul 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. # (only 16(b) is reviewable by BOS)
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Various Locations Pavement Renovation No 99Public Works · Planning · 3 shared street segments
- Upper Clipper Street Traffic Calming ProjectSFMTA · Completed · 2 shared street segments
- PW Hoffman Avenue Sewer Replacement (JV w PUC WD-2875)Public Works · Construction · 1 shared street segment
- Water Main and Sewer Replacement on Grand View AvenueSFPUC · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 28Public Works · Design · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment