Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Location Sewer Replacement No 22
0% in published scope
Public Works · Sewer, water or power · Design · Under way, ends 24 Aug 2027
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th Ave, 7th Ave, Acadia St, Beulah St, Clayton St, Copper Aly
- Planned bikeway
- Shared street, 0.13 mi on 7th Ave
- Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 492 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- “2490i, WW-764”
- Dates
Start End Public consultation not published not published Construction Aug 2026 Aug 2027 - Sources disagree
- The start date has passed (2026-08-24) while the phase is still Design, per the coordination feed.
- Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
8 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Clayton Street, west side, from Waller Street to 20 feet northerly (in existing red zone) Waller Street, south side, from Clayton Street to 21 feet w…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2874, 8- and 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets; approv…24 Mar 2026 · SFPUC Commission · approve the Consent Calendar
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- Award Contract No. WD-2874, 8-Inch & 16-Inch Ductile Iron Water Main Replacement on Joost Avenue from Ridgewood Avenue to Congo Street and Various Side Streets, to the responsible bidder that submitted the lowest respons…14 Nov 2023 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 7th Avenue, east side, from 122 feet to 198 feet south of Irving Street (73-foot station with red zones on either end) (Supervisor District 5) ♦ Laur…16 Aug 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in favor and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Muni Subway Expansion ProjectSFMTA · 3 shared street segments
- Various Locations Sewer Replacement No 38Public Works · Design · 2 shared street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 1 shared street segment
- Portola Dr Pavement RenovationPublic Works · Planning · 1 shared street segment
- Various Locations Pavement Renovation No 69Public Works · Construction · 1 shared street segment
- Parkmerced ProjectSFMTA · Planning · 1 shared street segment
- PW Various Locations Sewer Replacement No 18Public Works · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 36Public Works · Design · 1 shared street segment
How we built this: About the Data