Portola Dr Pavement Renovation

0% in published scope

Public Works · Repaving · Planning · Starts 28 May 2030, ends 10 Aug 2031

Early enough to change: Public Works gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

All 33 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
14th Ave, 15th Ave, Claremont Blvd, Del Sur Ave, Dorchester Way, Evelyn Way
Planned bikeway
Shared street, 4 mi on Portola Dr
Separated bikeway, 0.45 mi on Portola Dr
Would reach
4,253 residents (2020 census), 2 schools, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 33 street segments that lack one. Closer in: 3,716 residents with none within about one block (440 feet) today would have one; 4,784 residents, 1 school, 1 library with none within about two blocks (880 feet) today would have one
Scope
None published.
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMay 2030Aug 2031
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

4 decisions on the same streets, not naming this project

Construction on these street segments

2026202720282029203020312032todayPortola Dr Pavement RenovationVarious Location Sewer Replacement N…Various Locations Sewer Replacement …Various Locations Sewer Replacement …Various Location Sewer Replacement No 22: construction 24 Aug 2026 to 24 Aug 2027Various Locations Sewer Replacement No 23: construction 1 Oct 2026 to 30 Sep 2027Various Locations Sewer Replacement No 27: construction 19 Feb 2027 to 19 Feb 2028Portola Dr Pavement Renovation: construction 28 May 2030 to 10 Aug 203124 Aug 2026 – 24 Aug 20271 Oct 2026 – 30 Sep 202719 Feb 2027 – 19 Feb 202828 May 2030 – 10 Aug 2031

Construction start and end as each department publishes them; a dot where only one is published.

3 other projects on these street segments