252 street projects under way or coming up on the Biking and Rolling Plan's network.
Portola Dr Pavement Renovation
0% in published scope
Public Works · Repaving · Planning · Starts 28 May 2030, ends 10 Aug 2031
All 33 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 14th Ave, 15th Ave, Claremont Blvd, Del Sur Ave, Dorchester Way, Evelyn Way
- Planned bikeway
- Shared street, 4 mi on Portola Dr
Separated bikeway, 0.45 mi on Portola Dr - Would reach
- 4,253 residents (2020 census), 2 schools, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 33 street segments that lack one. Closer in: 3,716 residents with none within about one block (440 feet) today would have one; 4,784 residents, 1 school, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction May 2030 Aug 2031 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 15th Avenue, north side, from 5 feet to 67 feet west of Portola Drive (62-foot bike share station) (Supervisor District 7) (Approvable by the City T…22 Mar 2024 · Engineering hearing · Item withdrawn.
- ESTABLISH – SIDEWALK BIKE SHARE STATION 14th Avenue, east side, from 5 feet to 78 feet south of Geary Boulevard (72 feet 6 inch bike share station with a 20-foot red zone daylighting at the northern end of the station) (…18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - 4-HOUR TIME LIMIT, 8 AM TO 6 PM, MONDAY THROUGH FRIDAY Portola Drive, north side, from 138 feet east of Dorchester Way to Kensington Way (Supervisor District 7) (Requires approval by the SFMTA Board) Raynell …7 Apr 2023 · Engineering hearing · Revised location to exclude the westernmost 138 feet of the block. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 14th Avenue, east side, from Geary Boulevard to 82 feet southerly (72-foot bike share station with red zones on either side) (Supervisor District 1) …4 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
3 other projects on these street segments
- Various Locations Sewer Replacement No 23Public Works · Design · 4 shared street segments
- Various Location Sewer Replacement No 22Public Works · Design · 1 shared street segment
- Various Locations Sewer Replacement No 27Public Works · Design · 1 shared street segment
How we built this: About the Data