Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Sewer Replacement No 20
0% in published scope
Public Works · Sewer, water or power · Design · Starts 6 Nov 2026, ends 6 Nov 2027
3 of the project's 5 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 5th St, Austin St, Bay St, Brady St, Elm St, Error
- Planned bikeway
- Separated bikeway, 0.53 mi on Townsend St, Beale St, Polk St
- Scope
- “2468i”
- Dates
Start End Public consultation not published not published Construction Nov 2026 Nov 2027 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- Approve an increase of $215,000 to the contract cost contingency and an increase of 50 calendar days to the contract duration contingency for Contract No. WW-707R, Various Locations Sewer Replacement No. 11, with Basset …26 Sep 2023 · SFPUC Commission · approve the Consent Calendar
- RESCIND – GREEN METERED PARKING ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES (BIKE CORRAL) Austin Street, south side, from 26 feet to 48 feet east of Van Ness Avenue (Supervisor District #3) (Approvable by the City Tra…4 Feb 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Washington Street, south side, from 62 feet to 145 feet west of Van Ness Avenue (72-foot bike share station with red zones on either side) (Superviso…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Townsend Street, north side, from 27 feet 124 feet west of 5th Street (expanding existing bike share station to the west by 15 feet) ♦ 11(b). ESTABLI…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: One comment in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Active Beale StreetSFMTA · 3 shared street segments
- Beale Street Improvement ProjectPublic Works · In progress · 3 shared street segments
- PW Market Octavia Living Alleys Phase 2Public Works · Planning · 3 shared street segments
- DTX - Downtown Rail Extensionother · Design · 2 shared street segments
- Bikeway HardeningSFMTA · Planning · 2 shared street segments
- Various Locations Spot Main Sewer Replacement No 2Public Works · Design · 1 shared street segment
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 1 shared street segment
- PW Various Locations Sewer Replacement No 13Public Works · Construction · 1 shared street segment