WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets

0% in published scope

SFPUC · Sewer, water or power · Design · Under way, ends 9 Dec 2027

All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
18th St, 19th St, Arkansas St, Carolina St, De Haro St, Kansas St
Planned bikeway
Level 3 shared street, 0.81 mi on Mariposa St, Kansas St
Would reach
908 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 882 residents, 1 school with none within about one block (440 feet) today would have one; 788 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
“8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2026Dec 2027
Sources disagree
The start date has passed (2026-04-13) while the phase is still Design, per the coordination feed.
Records
SFPUC contract page (WD-2919 8-and12--Inch Ductile Iron Water Main Replacement and Rehab, Sewer Replacement and Rehab, and Pavement Renovation on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Sts) · Interagency coordination feed record (DataSF row)

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

8 decisions on the same streets, not naming this project

Construction on these street segments

202520262027202820292030203120322033203420352036todayWD-2919: 8- and 12-Inch Ductile Iron…WW-779 Various Locations Sewer Repla…PW Various Locations Sewer Replaceme…Street Resurfacing Program- BBSR Pav…16th St, 17th St, and 18th St Paveme…Various Locations Pavement Renovatio…Various Locations Pavement Renovatio…WW-779 Various Locations Sewer Replacement No. 32: construction 2 Jun 2025 to 29 Oct 2027PW Various Locations Sewer Replacement No 16: construction 8 Sep 2025 to 9 Feb 2027Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 202716th St, 17th St, and 18th St Pavement Renovation: construction 30 Aug 2033 to 13 Nov 2034Various Locations Pavement Renovation No 105: construction 28 Oct 2033 to 11 Jan 2035Various Locations Pavement Renovation Under Overhead Contact System No 3: construction 28 Jan 2034 to 13 Apr 2035WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 202713 Apr 2026 – 9 Dec 20272 Jun 2025 – 29 Oct 20278 Sep 2025 – 9 Feb 20271 Jul 2026 – 7 Jul 202730 Aug 2033 – 13 Nov 203428 Oct 2033 – 11 Jan 203528 Jan 2034 – 13 Apr 2035

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments