Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets
0% in published scope
SFPUC · Sewer, water or power · Design · Under way, ends 9 Dec 2027
All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 18th St, 19th St, Arkansas St, Carolina St, De Haro St, Kansas St
- Planned bikeway
- Level 3 shared street, 0.81 mi on Mariposa St, Kansas St
- Would reach
- 908 residents (2020 census), 2 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 882 residents, 1 school with none within about one block (440 feet) today would have one; 788 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “8- and 12-inch Ductile Iron Water Main Replacement on Mariposa from Vermont to Arkansas and on 18th St from San Bruno to Texas St”
- Dates
Start End Public consultation not published not published Construction Apr 2026 Dec 2027 - Sources disagree
- The start date has passed (2026-04-13) while the phase is still Design, per the coordination feed.
- Records
- SFPUC contract page (WD-2919 8-and12--Inch Ductile Iron Water Main Replacement and Rehab, Sewer Replacement and Rehab, and Pavement Renovation on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Sts) · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
8 decisions on the same streets, not naming this project
- ESTABLISH – GENERAL METERED PARKING, NO TIME LIMIT, 9AM TO 6PM MONDAY THROUGH SATURDAY Arkansas Street, both sides, from 16th Street to 200 feet southerly 7(b). ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X (Eligibility …26 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES Potrero Avenue, east side, from 181 feet to 211 feet south of 15th Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email removed…20 Mar 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-790, Evans Ave. and Mariposa St. Outfalls Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $2,576,348, with a duration of 379 con…9 Sep 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X 88 Arkansas Street 4(b). RESCIND – 4-HOUR PARKING, MON-SAT FROM 8 AM TO 6 PM ESTABLISH – 2-HOUR PARKING, MON-SAT FROM 8 AM TO 10 PM, EXCEPT FOR VEHICLES WITH AREA X PERMITS A…17 May 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 18th Street, north side, from 82 feet to 101 feet west of Guerrero Street (Supervisor District 8) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email remove…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WD-2801, 8- and 12-Inch Ductile Iron Water Main Replacement, 16- Inch Earthquake Resistant Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation, from Mariposa Street to Cesa…14 Feb 2023 · SFPUC Commission · approve Consent Calendar items 6a through 6h
- Hearing of persons interested in or objecting to the determination of exemption from environmental review under the California Environmental Quality Act issued as a Statutory Exemption by the Planning Department on June …13 Sep 2021 · Board of Supervisors · Filed without a hearing
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 41 shared street segments
- Arkansas Sewer Replacement (JV w PUC WD-2919)Public Works · Design · 9 shared street segments
- WW-779 Various Locations Sewer Replacement No. 32Public Works · Design · 7 shared street segments
- Various Locations Pavement Renovation No 105Public Works · Planning · 2 shared street segments
- PW Various Locations Sewer Replacement No 16Public Works · Construction · 2 shared street segments
- 16th St, 17th St, and 18th St Pavement RenovationPublic Works · Planning · 2 shared street segments
- Various Locations Pavement Renovation Under Overhead Contact System No 3Public Works · Planning · 2 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 1 shared street segment