WD-2934 16-, 12- and 8-inch Ductile Iron Water Main Replacement on Andover to Nevada St from Tompkins to Crescent Ave

0% in published scope

SFPUC · Sewer, water or power · Design · Under way, ends 31 Dec 2029

All 8 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Banks St, Crescent Ave, Folsom St, Nevada St, Ogden Ave, Prentiss St
Planned bikeway
Level 3 shared street, 0.55 mi on Crescent Ave
Would reach
637 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 8 street segments that lack one. Closer in: 992 residents with none within about one block (440 feet) today would have one; 1,267 residents with none within about two blocks (880 feet) today would have one
Scope
“12- and 8-inch Ductile Iron Water Main Replacement on Folsom, Banks, Prentiss and Nevada from Crescent to Cortland Streets”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2025Dec 2029
Sources disagree
The start date has passed (2025-04-21) while the phase is still Design, per the coordination feed.
Records
Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

7 decisions on the same streets, not naming this project

Construction on these street segments

2024202520262027202820292030todayWD-2934 16-, 12- and 8-inch Ductile …PW As Needed Main Sewer Replacement …PW Various Locations Sewer Replaceme…PW StreetResurfacingPro-BBSR Pavemen…Various Locations Sewer Replacement …Street Resurfacing Program-BBSR Pavi…PW As Needed Main Sewer Replacement No 10: construction 30 Sep 2024 to 2 Sep 2027PW Various Locations Sewer Replacement No 18: construction 25 Jun 2025 to 26 Oct 2026PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Various Locations Sewer Replacement No 25: construction 25 Feb 2027 to 31 Mar 2028Street Resurfacing Program-BBSR Paving FY 27-28: construction 1 Jul 2027 to 30 Jun 2028WD-2934 16-, 12- and 8-inch Ductile Iron Water Main Replacement on Andover to Nevada St from Tompkins to Crescent Ave: construction 21 Apr 2025 to 31 Dec 202930 Sep 2024 – 2 Sep 202725 Jun 2025 – 26 Oct 20261 Jul 2026 – 7 Jul 202725 Feb 2027 – 31 Mar 20281 Jul 2027 – 30 Jun 202821 Apr 2025 – 31 Dec 2029

Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.

8 other projects on these street segments