Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Sewer Replacement
0% in published scope
Public Works · Repaving · Design · Starts 6 Feb 2027, ends 20 Apr 2028
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Broadway, Fremont St, Front St, Pacific Ave, Sansome St
- Planned bikeway
- Separated bikeway, 0.067 mi on Sansome St
- Would reach
- 1,333 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 351 residents, 1 school with none within about one block (440 feet) today would have one; 134 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2479i”
- Dates
Start End Public consultation not published not published Construction Feb 2027 Apr 2028 - Records
- Public Works contract page (Front Street And Sansome Street Pavement Renovation and Sewer Replacement) · Interagency coordination feed record (DataSF row) · When the bid page closes at award, the closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
5 decisions on the same streets, not naming this project
- Award Contract No. WW-795, Sansome Street Outfall Improvements, to the responsible bidder that submitted the lowest responsive bid, R&S Construction Management, Inc., in the amount of $3,322,700 and with a duration of 30…9 Dec 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Sansome Street, east side, from 20 feet to 120 feet north of Sutter Street (Supervisor District 3) (Approvable by the City Traffic Engineer)6 Dec 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Pacific Avenue, between Walnut Street and Laurel Street – Tow-Away, No Parking Any Time ESTABLISH – TOW AWAY, NO PARKING ANY TIME Pacific Avenue, north side, from 200 feet east of Laurel Street to 220 feet westerly (220-…17 Mar 2023 · Engineering hearing
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Montgomery Street, east side, from Pacific Avenue to 50 feet southerly (42-foot bike share station with red zones on either side) (Supervisor Distric…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
5 other projects on these street segments
- Front St and Sansome St Pavement RenovationPublic Works · Design · 6 shared street segments
- Front Street, Sansome Street, 1st Street, and Montgomery Street Pavement Renovation and Sewer ReplacementPublic Works · Design · 4 shared street segments
- Battery/Sansome Quick-Build ProjectSFMTA · Completed · 2 shared street segments
- Better Market StreetSFMTA · Current · 1 shared street segment
- Transit U Improvement ProjectSFMTA · Implementation / Construction · 1 shared street segment
How we built this: About the Data