Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
J Church Safety and Accessibility Project: San Jose Avenue
0% in published scope
SFMTA · Bike, walk or safety · Implementation / Construction · Under way, ends 31 Dec 2027
17 of the project's 24 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's page for it names no bike work.
- Streets
- San Jose Ave, Duboce Ave, 17th St, Richland Ave, Church St, Theresa St
- Planned bikeway
- Separated bikeway, 2.9 mi on San Jose Ave, 17th St, Duboce Ave
Level 3 shared street, 0.36 mi on Richland Ave, Theresa St
Shared-use path, 0.31 mi on Duboce Ave
Shared street, 0.15 mi on Church St, San Jose Ave - Would reach
- 96 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 17 street segments that lack one. Closer in: 2,413 residents with none within about one block (440 feet) today would have one; 961 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Transit Improvement Project”
- Dates
Start End Public consultation Late 2022- Summer 2023 Late 2022- Summer 2023 Construction Sep 2023 Dec 2027 - Sources disagree
- SFMTA gives the phase as Implementation / Construction; the coordination feed gives Planning.
- Records
- SFMTA project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Amending Transportation Code Division II, Section 601, to designate full-time Transit-Only areas on San Jose Avenue between Ocean Avenue and Cotter Street and approving various parking and traffic modifications17 Oct 2023 · SFMTA Board · ADOPTED — 7 ayes (Resolution 231017-085)
- ESTABLISH – BUS, TAXI, LEFT TURN ONLY San Jose Avenue, southbound, from Cotter Street to Ocean Avenue San Jose Avenue, northbound, from Ocean Avenue to Cotter Street (Requires approval by the SFMTA Board) 27(b). ESTABLIS…18 Aug 2023 · Engineering hearing · Item 27(h) is pending TASC approval due to ongoing discussions. All other sub items in 27 have received TASC approval. Items forwarded to the SFMTA Board for final approval and implementation.
5 milestones and events from the project's own page
- Board of Directors meeting, October 17, 202317 Oct 2023 · Project page event
- Proposal to the SFMTA BoardFall 2023 · Project page timeline · Completed
- Engineering Public Hearing Meeting, August 18, 202318 Aug 2023 · Project page event
- Proposals to the communitySummer 2023 · Project page timeline · Completed
- Outreach to the communityLate 2022- Summer 2023 · Project page timeline · Completed
3 decisions on the same streets, not naming this project
- Award Contract No. WD-2765, 8-Inch and 16-Inch Ductile Iron Water Main Replacement on Jersey Street from Douglass Street to Church Street and Various Street Locations, to the responsible bidder that submitted the lowest …9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Finding that temporarily closing one block of Church Street provides for the safety and protection of transit riders who use the street during the temporary closure due to the large amount of transit riders needing to cr…15 Sep 2020 · SFMTA Board
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION San Jose Avenue, west side, from 21 feet to 87 feet south of Sgt. John V. Young Lane (63-foot bike share station with red zones on either end) (Super…6 Dec 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 32 shared street segments
- PW - M & J Lines - Muni Forward ProjectPublic Works · Design · 28 shared street segments
- Church St Pavement RenovationPublic Works · Planning · 17 shared street segments
- J Church Improvement Project - Noe ValleySFMTA · Planning · 16 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 15 shared street segments
- Northbound San Jose Avenue and I-280 Off-Ramp Road Diet Pilot ProjectSFMTA · Completed · 13 shared street segments
- Bosworth/Monterey Connections Quick-Build ProjectSFMTA · Planning · 9 shared street segments
- Church and Market Street Intersection ImprovementsSFMTA · 7 shared street segments
4 documents on the project page