Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation Under Overhead Contact System No 4
0% in published scope
Public Works · Repaving · Planning · Starts 2 Feb 2035, ends 16 Apr 2036
All 4 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 14th St, Arbol Ln, Ashbury St, Baker St, Balboa St, Buchanan St
- Planned bikeway
- Shared street, 0.82 mi on Ashbury St
- Would reach
- 4,310 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 2,661 residents, 1 school with none within about one block (440 feet) today would have one; 2,929 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “Various Locations blocks with OCS”
- Dates
Start End Public consultation not published not published Construction Feb 2035 Apr 2036 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
17 decisions on the same streets, not naming this project
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 14th Street, north side, from 37 feet to 53 feet east of Woodward Street (for 16-foot corral) 12(b). RESCIND – RED ZONE 14th Street, north side, from Woodward Street to 10…4 Sep 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- RESCIND – GREEN METERED ZONE ESTABLISH – RED ZONE Parnassus Avenue, north side, from Cole Street to 21 feet easterly 9(b). ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Parnassus Avenue, north side, from 10 feet to 21…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANYTIME, EXCEPT BICYCLES Balboa Street, north side, from 14 feet to 29 feet east of 5th Avenue Balboa Street, south side, from 15 feet to 30 feet west of 5th Avenue (Supervisor District 1) (Approva…17 Jan 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – CLASS III BIKE LANE Baker Street, southbound, from Fell Street to Oak Street 38(b). RESCIND – ANGLED PARKING ESTABLISH – PARALLEL PARKING Baker Street, west side, between Oak Street and Fell Street 38(c). ESTAB…8 Nov 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Balboa Street, south side, from 35th Avenue to 34 feet westerly (for 20-foot corral and red zones) (Supervisor District 1) (Approvable by the City Traffic Engineer) Grant …8 Nov 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – CLASS III BIKE LANE Baker Street, southbound, from Fell Street to Oak Street 8(b). RESCIND – ANGLED PARKING ESTABLISH – PARALLEL PARKING Baker Street, west side, between Oak Street and Fell Street 8(c). ESTABLI…18 Oct 2024 · Engineering hearing · Item withdrawn by staff.
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO PARKING ANYTIME EXCEPT BICYCLES Balboa Street, south side, from 60 feet to 80 feet east of 19th Avenue. (Supervisor District 1) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — …22 Mar 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by Trinet Construction, Inc. for Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair; approve Modification No. 1 (Final) decreasing the Contract amoun…23 Jan 2024 · SFPUC Commission · approve items 7a through 7i
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Balboa Street, south side, from 92 feet to 113 feet west of 6th Avenue (removes General Metered Parking Space #511) (Supervisor District 1) (Approvable by the City Traffic…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Buchanan Street, east side, from 22 feet to 85 feet north of Lombard Street (63-foot station) (Supervisor District 2) (Approvable by the City Traffi…22 Sep 2023 · Engineering hearing · On hold pending exploration of a Moscone Park site as requested by the Supervisor.
- Award Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair, in the amount of $566,000, and with a duration of 240 consecutive calendar days, to the responsible bidder that s…10 Jan 2023 · SFPUC Commission · Approve Consent Calendar Items 6a through 6j
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- ESTABLISH – YIELD SIGN Balboa Street (frontage road), westbound, at Balboa Street (approximately 30 feet west of Arguello Boulevard) (Supervisor District 1) (Approvable by the City Traffic Engineer) Jeffrey Tom, [staff e…3 Sep 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Balboa Street, north side, from La Playa Street to 80 feet westerly (72-foot station with red zones on either side) (Supervisor District 1) Project C…4 Sep 2020 · Engineering hearing · Continued to consider the possibility of an alternate location on the Great Highway.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Western SOMA and Northern Mission Districts Sewer Replacement WW-719DPublic Works · Design · 5 shared street segments
- FASIP - Western SOMA and Northern Mission District Sewer SystemSFPUC · Design · 5 shared street segments
- Western Addition Community Based Transportation Plan ImplementationSFMTA · Current · 4 shared street segments
- PW Various Locations Sewer Replacement No 16Public Works · Construction · 3 shared street segments
- Eddy Street Two-Way Conversion ProjectSFMTA · Current · 3 shared street segments
- Octavia Boulevard Enhancement ProgramSFMTA · Current · 2 shared street segments
- Jones Street Quick-BuildSFMTA · Completed · 2 shared street segments
- Lyon Slow StreetSFMTA · 2 shared street segments