252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Curb Ramps No 18
Already built
Public Works · Streetscape · Construction · Under way, ends 30 May 2027
The project's one street segment on a planned bikeway street already has an all-ages bikeway.
- Streets
- 8th St, Alemany Blvd, Ashbury St, Bay St, Brush Pl, Egbert Ave
- Planned bikeway
- Separated bikeway, 0.12 mi on Alemany Blvd
- Scope
- “This project will provide planning and design for San Francisco Public Works Curb Ramp Program. After design the Construction to be done under Prop K funding.”
- Dates
Start End Public consultation not published not published Construction Jul 2026 May 2027 - Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Various Locations Curb Ramps No. 18 – Contract Award12 Feb 2026 · Public Works Commission
6 decisions on the same streets, not naming this project
- RESCIND – CLASS II BIKEWAY Alemany Boulevard, westbound, from Congdon Street to 520 feet easterly (on freeway overpass) (Requires approval by the SFMTA Board) 35(b). ESTABLISH – CLASS IV PROTECTED BIKEWAY Alemany Bouleva…8 Nov 2024 · Engineering hearing · Clarified approval path, location of 35(a), and 35(b) is a reclassification of an existing Class II facility to a Class IV facility. Items 35(b), 35(c) and 35(d) approved by the City Traffic Engineer for implementation. Item 35(a) approved by the City Traffic Engineer to forward to the SFMTA Board f
- ESTABLISH - CLASS IV BIKEWAY (TWO-WAY PROTECTED) Alemany Boulevard from Stoneybrook Ave/Cambridge Ave to Crescent Ave/Putnam Ave Installed a concrete barrier to protect the existing bikeway on Alemany Boulevard between S…8 Jan 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alemany Boulevard, east side, from 53 feet to 122 feet south of Francis Street (62-foot bike share station with red zones on either end) (Supervisor …12 Jun 2020 · Engineering hearing · On hold at the request of the District 11 Supervisor. Public Comments: Comments received in support and opposition.
- Resolution approving the First Amendment to the Freeway Maintenance Agreement between the City and County of San Francisco and the California Department of Transportation, to include City's maintenance of bicycle lanes a…9 Jun 2020 · Board of Supervisors · Passed
- ESTABLISH – NO PARKING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alemany Boulevard, north side, from 100.5 feet to 159.5 feet east of Silver Avenue (52’-5” bike share station with red zones on end of the station) (S…6 Dec 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – SIDEWALK BIKE SHARE STATION Egbert Avenue, north side, from Jennings Street to 72 feet easterly (70-foot bike share station) (Supervisor District 10) Laura Stonehill, [staff email removed — see the order] Pro…1 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Mission, 8th, 9th, Howard and Natoma Brick Sewer RehabilitationPublic Works · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 29Public Works · Design · 1 shared street segment
- Various Locations Pavement Renovation Under Overhead Contact System No 4Public Works · Planning · 1 shared street segment
- Alemany Interchange Improvement ProjectPublic Works · In progress · 1 shared street segment
- Alemany Interchange Bike Lanes ProjectSFMTA · Completed · 1 shared street segment
- PW Various Locations Sewer Replacement No 13Public Works · Construction · 1 shared street segment
How we built this: About the Data