Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Sunset Irrigation Recycled Water

0% in published scope

Public Works · Sewer, water or power · Design · Starts 29 Jun 2027, ends 2 Mar 2029

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

3 of the project's 5 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
36th Ave, 37th Ave, Irving St, Judah St, Lake Merced Blvd, Lawton St
Planned bikeway
Shared street, 0.35 mi on Vicente St, Rivera St
Would reach
1,592 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 373 residents with none within about one block (440 feet) today would have one; 1,054 residents with none within about two blocks (880 feet) today would have one
Scope
“Provide recycled water to the sunset irrigation system.”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJun 2027Mar 2029
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Westside Enhanced Water Recycling Project

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

17 decisions on the same streets, not naming this project

Construction on these street segments

20242025202620272028202920302031203220332034todaySunset Irrigation Recycled WaterPEFWS Pipeline Contract B - 36-inch …WD-2922: 8-inch Ductile Iron Water M…PEFWS Pipeline Contract F- 24-Inch W…Holloway Ave and Lake Merced Blvd Pa…PEFWS Pipeline Contract B - 36-inch Welded Steel Pipe: construction 1 Apr 2024 to 1 Mar 2028WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side Streets: construction 7 Aug 2026 to 29 Sep 2030PEFWS Pipeline Contract F- 24-Inch Water: construction 1 Jan 2028 to 1 Jan 2030Holloway Ave and Lake Merced Blvd Pavement Renovation: construction 29 Aug 2032 to 12 Nov 2033Sunset Irrigation Recycled Water: construction 29 Jun 2027 to 2 Mar 202929 Jun 2027 – 2 Mar 20291 Apr 2024 – 1 Mar 20287 Aug 2026 – 29 Sep 20301 Jan 2028 – 1 Jan 203029 Aug 2032 – 12 Nov 2033

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.