Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Sunset Irrigation Recycled Water
0% in published scope
Public Works · Sewer, water or power · Design · Starts 29 Jun 2027, ends 2 Mar 2029
3 of the project's 5 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 36th Ave, 37th Ave, Irving St, Judah St, Lake Merced Blvd, Lawton St
- Planned bikeway
- Shared street, 0.35 mi on Vicente St, Rivera St
- Would reach
- 1,592 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 373 residents with none within about one block (440 feet) today would have one; 1,054 residents with none within about two blocks (880 feet) today would have one
- Scope
- “Provide recycled water to the sunset irrigation system.”
- Dates
Start End Public consultation not published not published Construction Jun 2027 Mar 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Westside Enhanced Water Recycling Project
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
17 decisions on the same streets, not naming this project
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 37th Avenue, east side, from 5 feet to 68 feet north of Rivera Street (63-foot station) (Supervisor District 4) (Approvable by the City Tra…20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Ordinance amending the Transportation Code to waive fees related to the temporary closure of streets for events on Irving, Noriega, and Taraval Streets, from 19th Avenue to the Great Highway, that are organized by commun…3 Sep 2024 · Board of Supervisors · Passed
- Accept work performed by KJ Woods Construction, Inc., under Contract No. WW-711, Wawona Area Stormwater Improvement and Vicente Street Water Main Replacement; approve Modification No. 8 (Final) decreasing the contract am…9 Apr 2024 · SFPUC Commission · approve the Consent Calendar
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- Approving approves parking and traffic modifications at the intersection of Judah Street with La Playa Street and Lower Great Highway, and on Lower Great Highway between Lincoln Way and Kirkham Street, associated with th…16 Jan 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 240116-007)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 36th Avenue, west side, from Ortega Street to 62 feet northerly (52-foot bike share station with red zones on either end) (Supervisor District 4) (Ap…6 Jan 2023 · Engineering hearing · Item withdrawn. Item #36 is a duplicate of item #28.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Irving Street, north side, from 12 feet to 89 feet west of 17th Avenue (Supervisor District 7) (Approvable by the City Traffic Engineer) Laura Stoneh…2 Dec 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- Approve and recommend to the Board of Supervisors the conditional termination of certain sewer and water easements encumbering San Francisco Blocks 7332, 7333, 7333A, and 7333B located within Parkmerced near Lake Merced …24 May 2022 · SFPUC Commission · approve Item 14
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 36th Avenue, west side, from Ortega Street to 62 feet northerly (52-foot bike share station with red zones on either end) (Supervisor District 4) (Ap…18 Feb 2022 · Engineering hearing · Item withdrawn.
- Authorize the General Manager to execute a Memorandum of Understanding (MOU) with the San Francisco Municipal Transportation Agency (SFMTA) to set forth the agencies’ respective responsibilities, including cost sharing a…8 Feb 2022 · SFPUC Commission · approve Item 13
- Accept work performed by JDB & Sons Construction for Contract No. WW-611, Cutler Avenue, Lower Great Highway, Sloat Boulevard, and Wawona Street Sewer Replacement; approve Modification No. 6 (Final) decreasing the contra…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Approve an increase of 280 calendar days to the contract duration contingency for Contract No. WW-691, Sunset Boulevard Greenway – Phase II, Irving Street to Ulloa Street with Minerva Construction, Inc.; and authorize th…27 Apr 2021 · SFPUC Commission · approve Consent Calendar items 9a and 9b
- Approve the plans and specifications, and award Contract No. WW-711, Wawona Area Stormwater Improvement and Vicente Street Water Main Replacement Project, in the amount of $29,132,100 and with a duration of 987 consecuti…13 Apr 2021 · SFPUC Commission · approve Consent Calendar item 15
- Approve the plans and specifications, and award Contract No. WW-711, Wawona Area Stormwater Improvement and Vicente Street Water Main Replacement Project, in the amount of $29,132,100 and with a duration of 987 consecuti…23 Mar 2021 · SFPUC Commission
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Outer Sunset Traffic Management ProjectSFMTA · Completed · 13 shared street segments
- PEFWS Pipeline Contract B - 36-inch Welded Steel PipeSFPUC · Design · 6 shared street segments
- Vicente Street Bicycle and Pedestrian Safety ProjectSFMTA · Completed · 6 shared street segments
- PEFWS Pipeline Contract F- 24-Inch WaterSFPUC · Planning · 3 shared street segments
- N-JudahSFMTA · Planning · 3 shared street segments
- Joint - MTA Lead - Judah St Pavement RenovationPublic Works · Planning · 3 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side StreetsSFPUC · Design · 2 shared street segments
- Holloway Ave and Lake Merced Blvd Pavement RenovationPublic Works · Planning · 1 shared street segment