Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Sewer Replacement No 23

0% in published scope

Public Works · Sewer, water or power · Design · Starts 1 Oct 2026, ends 30 Sep 2027

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

3 of the project's 4 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
10th St, 20th St, 30th St, Bryant St, Burnett Ave, Delta St
Planned bikeway
Separated bikeway, 0.57 mi on Portola Dr, Illinois St
Would reach
97 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 334 residents with none within about one block (440 feet) today would have one; 402 residents with none within about two blocks (880 feet) today would have one
Scope
“2481i, WW-765”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionOct 2026Sep 2027
Records
SFPUC contract page (WW-765 Various Locations Sewer Replacement No. 23) · Interagency coordination feed record (DataSF row)

City decisions naming this project

Construction on these street segments

2023202520272029203120332035todayVarious Locations Sewer Replacement …Visitacion Valley and Portola Commun…Contract 36 Traffic Signal Modificat…13th Street Safety ProjectBikeway HardeningPW As Needed Spot Sewer Replacement …Portola Dr Pavement RenovationVarious Locations Pavement Renovatio…Contract 36 Traffic Signal Modifications: construction Apr 2024 to 31 May 202613th Street Safety Project: construction 3 Feb 2025 to 31 Dec 2026Bikeway Hardening: construction 1 Jul 2025 to 30 Jun 2027PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026Portola Dr Pavement Renovation: construction 28 May 2030 to 10 Aug 2031Various Locations Pavement Renovation Under Overhead Contact System No 3: construction 28 Jan 2034 to 13 Apr 2035Visitacion Valley and Portola Community Based Transportation Plan: construction start not published to 31 May 2023Various Locations Sewer Replacement No 23: construction 1 Oct 2026 to 30 Sep 20271 Oct 2026 – 30 Sep 2027until 31 May 2023Apr 2024 – 31 May 20263 Feb 2025 – 31 Dec 20261 Jul 2025 – 30 Jun 202722 Sep 2025 – 26 Oct 202628 May 2030 – 10 Aug 203128 Jan 2034 – 13 Apr 2035

Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches