Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 23
0% in published scope
Public Works · Sewer, water or power · Design · Starts 1 Oct 2026, ends 30 Sep 2027
3 of the project's 4 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 10th St, 20th St, 30th St, Bryant St, Burnett Ave, Delta St
- Planned bikeway
- Separated bikeway, 0.57 mi on Portola Dr, Illinois St
- Would reach
- 97 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 334 residents with none within about one block (440 feet) today would have one; 402 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2481i, WW-765”
- Dates
Start End Public consultation not published not published Construction Oct 2026 Sep 2027 - Records
- SFPUC contract page (WW-765 Various Locations Sewer Replacement No. 23) · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WW-765, Various Locations Sewer Replacement No. 23, to the responsible bidder that submitted the lowest responsive bid, Michael O’Shaughnessy Construction, Inc., in the amount of $2,499,776 and with a …28 Jul 2026 · SFPUC Commission · approve the Consent Calendar
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Portola Dr Pavement RenovationPublic Works · Planning · 4 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 2 shared street segments
- 13th Street Safety ProjectSFMTA · Implementation / Construction · 1 shared street segment
- Various Locations Pavement Renovation Under Overhead Contact System No 3Public Works · Planning · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Contract 36 Traffic Signal ModificationsSFMTA · Implementation / Construction · 1 shared street segment
- Bikeway HardeningSFMTA · Planning · 1 shared street segment
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 1 shared street segment