Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Cabrillo Slow Street
Not stated
SFMTA · Bike, walk or safety · Legislated · No start date published, no end date published
1 of the project's 8 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Cabrillo St, 34th Ave, 23rd Ave
- Planned bikeway
- Shared street, 1.2 mi on Cabrillo St, 34th Ave, 23rd Ave
- Scope
- None published.
- Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 23rd Avenue, east side, from 10 feet to 73 feet south of Sloat Boulevard (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Continued.
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – STOP Signs Cabrillo Street, eastbound and westbound, at 2nd Avenue (Supervisor District 1) (Approvable by the City Traffic Engineer) Edward Tang, [staff email removed — see the order]2 Jun 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
3 other projects on these street segments
- Slow StreetsSFMTA · Construction · 5 shared street segments
- 23rd Avenue Slow StreetSFMTA · 4 shared street segments
- WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving Renovation on Fulton Street from Great Highway to 31st Avenue and Various LocationsSFPUC · Design · 1 shared street segment
1 documents on the project page