Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving Renovation on Fulton Street from Great Highway to 31st Avenue and Various Locations
0% in published scope
SFPUC · Repaving · Design · Under way, ends 1 Aug 2028
1 of the project's 2 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 39th Ave, 40th Ave, 41st Ave, 42nd Ave, 43rd Ave, 44th Ave
- Planned bikeway
- Shared street, 0.26 mi on 43rd Ave
Bikeway of undecided type, 0.26 mi on 47th Ave - Scope
- “8-Inch Ductile Iron Water Main Replacement on Fulton Street from Great Highway to 31st Avenue and Various Locations”
- Dates
Start End Public consultation not published not published Construction Feb 2024 Aug 2028 - Sources disagree
- The start date has passed (2024-02-03) while the phase is still Design, per the coordination feed.
- Records
- SFPUC contract page (WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31st Ave. and on Various Side Streets) · Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
10 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Fulton Street, south side, from 10 feet to 30 feet west of Pierce Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant Brokl…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, east side, from 5 feet to 68 feet north of Quintara Street (63-foot station) (Supervisor District 4) (Approvable by the City T…20 Sep 2024 · Engineering hearing · Continued.
- Approve an increase of 115 calendar days to the contract duration contingency for Contract No. WW-684, 45th, 46th, 47th Aves, Vicente and, Wawona Streets, and Sloat Blvd Sewer Replacement, with Precision Engineering, Inc…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 44th Avenue, east side, from Judah Street to 60 feet southerly (52-foot bike share station with red zones on either end) (Supervisor District 4) (App…6 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve the plans and specifications and award Contract No. WW-684, 45th, 46th, 47th Aves, Vicente, Wawona Streets and Sloat Blvd. Sewer Replacement, in the amount of $7,342,613, and with a duration of 375 consecutive ca…8 Nov 2022 · SFPUC Commission · approve the Consent Calendar, with the amendment to the date on the
- ESTABLISH – TRAFFIC SIGNAL 39th Avenue, Skyline Boulevard, and Sloat Boulevard (Supervisor Districts 4 and 7) (Approvable by the City Traffic Engineer) Corbin Skerrit, [staff email removed — see the order] A new traffic …23 Sep 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 44th Avenue, east side, from Judah Street to 60 feet southerly (52-foot bike share station with red zones on either end) (Supervisor District 4) (App…18 Feb 2022 · Engineering hearing · Item withdrawn.
- Accept work performed by Marinship Development Interest, LLC, for Contract No. WW-694, Lincoln Way/48th Ave Diversion Structure Modification; approve Modification No. 1 (Final), decreasing the contract amount by $7,400, …9 Feb 2021 · SFPUC Commission · approve Consent Calendar items 9a through 9d
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Great Highway, east side, from Balboa Street to 85 feet northerly (85-foot station) (Supervisor District 1) Pallavi Panyam, [staff email removed — se…13 Nov 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Hearing of persons interested in or objecting to a Statutory Exemption by the Planning Department under the California Environmental Quality Act issued September 1, 2022, for the proposed Municipal Transportation Agency …Undated · Board of Supervisors · Killed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Fulton Street Water and Sewer Improvements ProjectSFPUC · Bid & Award · 9 shared street segments
- Slow StreetsSFMTA · Construction · 7 shared street segments
- Fulton Street Safety and Transit ProjectSFMTA · Completed · 7 shared street segments
- Various Locations Sewer Replacement #21Public Works · Design · 6 shared street segments
- PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving)SFPUC · Planning · 3 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 2 shared street segments
- PW Various Locations Sewer Replacement No 21Public Works · Design · 2 shared street segments
- PW Contract 35 Traffic Signal UpgradePublic Works · Construction · 1 shared street segment
How we built this: About the Data