252 street projects under way or coming up on the Biking and Rolling Plan's network.
Chinatown and SOMA Large Diameter Sewer Improvements
0% in published scope
Public Works · Sewer, water or power · Design · Starts 31 Jul 2027, ends 30 Jul 2028
3 of the project's 19 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 1st St, 5th St, Bartol St, Broadway, Card Aly, Clay St
- Planned bikeway
- Separated bikeway, 1.6 mi on 5th St, The Embarcadero
Shared street, 0.17 mi on Montgomery St, Pacific Ave - Would reach
- 4,492 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,146 residents, 1 school with none within about one block (440 feet) today would have one; 1,696 residents, 2 schools with none within about two blocks (880 feet) today would have one
- Scope
- “SFPUC Contract WW-812 / SFPW ID 2620I. Rehabilitation of brick and concrete sewers from 2'6"x3'9" to 10' diameter on 5th Street, 1st Street, The Embarcadero, Broadway, Montgomery, Clay Streets.”
- Dates
Start End Public consultation not published not published Construction Jul 2027 Jul 2028 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer System Upgrades
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
7 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Clay Street, north side, from Davis Street to 66 feet westerly (Supervisor District 3) (Approvable by the City Traffic Engineer)12 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-795, Sansome Street Outfall Improvements, to the responsible bidder that submitted the lowest responsive bid, R&S Construction Management, Inc., in the amount of $3,322,700 and with a duration of 30…9 Dec 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – SIDEWALK BIKE SHARE STATION Clay Street, south side, from 20 feet to 120 feet east of Battery Street (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura Stonehill, [staff email removed — s…19 Jul 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Clay Street, south side, from 138 feet to 206 feet east of Lyon Street (63-foot bike share station in parking lane with red zones on either side) (Su…3 Jun 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 5th Street, west side, from 6 feet to 92 feet south of Howard Street (86-foot bike share station with angled plates in floating buffer) (Supervisor D…8 Apr 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Montgomery Street, east side, from Pacific Avenue to 50 feet southerly (42-foot bike share station with red zones on either side) (Supervisor Distric…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- 5th St Safety Improvement ProjectPublic Works · Planning · 34 shared street segments
- Broadway, Pacific Ave and Vallejo St Pavement RenovationPublic Works · Planning · 8 shared street segments
- 1st Street Safety Improvements ProjectPublic Works · Planning · 6 shared street segments
- Various Locations Pavement Renovation Under Overhead Contact System No 1Public Works · Planning · 6 shared street segments
- Front St and Sansome St Pavement RenovationPublic Works · Design · 3 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 3 shared street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 3 shared street segments
- 85 Bluxome Stother · Planning · 3 shared street segments