SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Chinatown and SOMA Large Diameter Sewer Improvements

0% in published scope

Public Works · Sewer, water or power · Design · Starts 31 Jul 2027, ends 30 Jul 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

3 of the project's 19 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
1st St, 5th St, Bartol St, Broadway, Card Aly, Clay St
Planned bikeway
Separated bikeway, 1.6 mi on 5th St, The Embarcadero
Shared street, 0.17 mi on Montgomery St, Pacific Ave
Would reach
4,492 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,146 residents, 1 school with none within about one block (440 feet) today would have one; 1,696 residents, 2 schools with none within about two blocks (880 feet) today would have one
Scope
“SFPUC Contract WW-812 / SFPW ID 2620I. Rehabilitation of brick and concrete sewers from 2'6"x3'9" to 10' diameter on 5th Street, 1st Street, The Embarcadero, Broadway, Montgomery, Clay Streets.”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJul 2027Jul 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer System Upgrades

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

7 decisions on the same streets, not naming this project

Construction on these street segments

2026202720282029203020312032todayChinatown and SOMA Large Diameter Se…Transbay Howard Streetscape Improvem…Front St and Sansome St Pavement Ren…5th St Safety Improvement ProjectBroadway, Pacific Ave and Vallejo St…Transbay Howard Streetscape Improvement Project: construction 2026 to 31 Dec 2028Front St and Sansome St Pavement Renovation: construction 6 Feb 2027 to 20 Apr 20285th St Safety Improvement Project: construction 1 May 2029 to 3 Jan 2031Broadway, Pacific Ave and Vallejo St Pavement Renovation: construction 28 May 2029 to 10 Aug 2030Chinatown and SOMA Large Diameter Sewer Improvements: construction 31 Jul 2027 to 30 Jul 202831 Jul 2027 – 30 Jul 20282026 – 31 Dec 20286 Feb 2027 – 20 Apr 20281 May 2029 – 3 Jan 203128 May 2029 – 10 Aug 2030

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.