Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Hearst Avenue Slow Street

Builds 61%

SFMTA · Bike, walk or safety · Legislated · Under way, no end date published

1 of the project's 6 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.75 mi of the plan's bikeway.

Streets
Hearst Ave, Ridgewood Ave
Planned bikeway
Shared street, 1.1 mi on Hearst Ave, Ridgewood Ave
Separated bikeway, 0.11 mi on Hearst Ave
Would reach
317 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 263 residents with none within about one block (440 feet) today would have one; 382 residents with none within about two blocks (880 feet) today would have one
Scope
None published.
Dates
StartEnd
Public consultationnot publishednot published
Construction2021not published
Records
SFMTA project page

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

3 decisions on the same streets, not naming this project

Construction on these street segments

2021202320252027202920312033todayHearst Avenue Slow StreetBosworth/Monterey Connections Quick-…Various Locations Sewer Replacement …Various Locations Pavement Renovatio…Bosworth/Monterey Connections Quick-Build Project: construction Jan 2027 to 31 May 2027Various Locations Sewer Replacement No 40: construction 4 Aug 2028 to 4 Aug 2029Various Locations Pavement Renovation No 101: construction 28 Dec 2030 to 11 Mar 2032Hearst Avenue Slow Street: construction 2021 to end not publishedfrom 2021Jan 2027 – 31 May 20274 Aug 2028 – 4 Aug 202928 Dec 2030 – 11 Mar 2032

Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.

4 other projects on these street segments
1 documents on the project page