Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Stormwater Trash Capture
0% in published scope
Public Works · Spot repairs · Design · Starts 28 Jun 2027, ends 24 Mar 2028
4 of the project's 8 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 26th St, Amador St, Cargo Way, Chestnut St, Error, Folsom St
- Planned bikeway
- Separated bikeway, 2.3 mi on The Embarcadero
- Scope
- “2492i_Installation of high flow trash capture systems at 7 sites within Port Jurisdiction with the objective to reduce trash discharges into San Francisco Bay Waters.”
- Dates
Start End Public consultation not published not published Construction Jun 2027 Mar 2028 - Official source
- No Public Works page for this job, and no closest official source found: Public Works' site search for “trash capture” returned no page, and SFPUC's Sewer System Upgrades Improvement Program page does not name trash capture; the job is in Port jurisdiction (2026-09-29).
- Records
- Interagency coordination feed record (DataSF row)
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
10 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 30 feet to 125 feet west of 1st Street (Supervisor District 6) (Approvable by the City Traffic Engineer)14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, west side, from 35 feet to 87 feet north of 21st Street (52-foot station) (Supervisor District 9) (Approvable by the City Traffic Eng…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – BLUE ZONE Folsom Street, south side, from 9 feet to 31 feet east of Mabini Street Folsom Street, south side, from 7 feet to 29 feet east of Hawthorne Street 10(b). ESTABLISH – METERED YELLOW ZONE, COMMERCIAL …2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- RESCIND – NO STOPPING, EXCEPT BICYCLES RESCIND – BIKE SHARE STATION Folsom Street, north side, from 105 feet to 185 feet west of Main Street (80-foot bike share station) 12(b). ESTABLISH – NO STOPPING, EXCEPT BICYCLES ES…8 Mar 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Chestnut Street, north side, from 24 feet to 104 feet east of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura…3 Feb 2023 · Engineering hearing · Held pending the outcome of further stakeholder discussion.
- Approve an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line, with JMB Construction, Inc.; and authorize the General Manager to approve future mo…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 106 feet to 186 feet west of Main Street (73-foot bike share station with space on either end) 20(b). RESCIND – YELLO…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve an increase of 96 calendar days to the contract duration contingency for Contract No. WW-696, Cargo Way Flush Line; and authorize the General Manager to approve future modifications to the contract for a total co…9 Mar 2021 · SFPUC Commission · approve Consent items 9c, d, f, and h
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 183 feet to 250 feet west of 2nd Street (66-foot bike share station) (Supervisor District 6) Pallavi Panyam, [staff e…16 Oct 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. The Environmental Review citation, Case 2015-005492ENV, is accurate since temporary station installation and/or relocation are included in the bike share system.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 41 feet to 92 feet west of 7th Street (51-foot bike share station in the floating parking lane) (Supervisor District …15 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Northern Waterfront Electrical Improvements (NWEI)SFPUC · Planning · 9 shared street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 8 shared street segments
- The Embarcadero 2020 Quick-Build ProjectsSFMTA · Project Evaluation · 7 shared street segments
- Central Embarcadero Safety ProjectSFMTA · 7 shared street segments
- Amador Street Improvements Phase 2Public Works · Construction · 4 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 4 shared street segments
- Howard Street Quick-Build ProjectSFMTA · Completed · 4 shared street segments
- Stormwater Trash Capture Phase 2Public Works · Planning · 3 shared street segments