Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Contract 66 New Traffic Signals
Not stated
SFMTA with Public Works · Bike, walk or safety · Detailed Design · Starts Fall 2027 - Fall 2028, ends 30 Nov 2028
8 of the project's 13 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- Great Hwy, 4th St, 41st Ave, Guerrero St, San Jose Ave, Martin Luther King Jr Dr
- Planned bikeway
- Shared-use path, 6 mi on Great Hwy
Separated bikeway, 3.1 mi on Great Hwy, Guerrero St, San Jose Ave
Bikeway of undecided type, 0.34 mi on 4th St
Shared street, 0.26 mi on 41st Ave
Car-free street, 0.17 mi on Martin Luther King Jr Dr - Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 8 street segments that lack one. Closer in: 1,622 residents (2020 census), 1 school with none within about one block (440 feet) today would have one
- Scope
- “Contract 66 will install new traffic signals at (12) locations. All new signal locations will have new pedestrian countdown signals (PCS), accessible pedestrian signals (APS), controllers, conduit, wiring, poles, and curb ramps. The (12) locations that will receive traffic signals are 10th Avenue\Lincoln, 39th Avenue\Fulton, 28th Street\Guerrero, 41st Avenue\Lincoln, 4th Street\Long Bridge, 4th Street\Mission Rock, 4th Avenue\Fulton, Mission\Mary\Mint, Cesar Chavez\Florida, Divisadero\Castro\Wal”
- Dates
Start End Public consultation not published not published Construction Fall 2027 - Fall 2028 Nov 2028 - Sources disagree
- The coordination feed gives construction starting 2027-03-01; SFMTA's project page gives 2027-10, which is shown.
The coordination feed gives construction ending 2028-03-01; SFMTA's project page gives 2028-11-30, which is shown.
The coordination feed gives construction starting 2027-07-01; SFMTA's project page gives 2027-10, which is shown.
The coordination feed gives construction ending 2029-01-10; SFMTA's project page gives 2028-11-30, which is shown.
SFMTA gives the phase as Detailed Design; the coordination feed gives Design. - Records
- SFMTA project page · Interagency coordination feed record (DataSF row) · Interagency coordination feed record (DataSF row)
City decisions naming this project
- ESTABLISH – TRAFFIC SIGNAL Mary Street, Mint Street, and Mission Street 23(b). ESTABLISH – RED ZONE Mission Street, south side, from Mary Street to 10 feet westerly 23(c). ESTABLISH – WHITE ZONE, PASSENGER LOADING, AT AL…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 39th Avenue and Fulton Street 20(b). ESTABLISH – RED ZONE 39th Avenue, west side, from Fulton Street to 15 feet northerly (removes 1 parking space) (Supervisor District 1) (Approvable by the Ci…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 28th Street and Guerrero Street 17(b). ESTABLISH – TRAFFIC ISLAND Guerrero Street center median island, from 28th Street to 18 feet southerly Guerrero Street center median island, from 28th Str…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – RECTANGULAR RAPID FLASHING BEACON (RRFB) 4th Street and Mission Rock Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jarrett Hornbostel, [staff email removed — see the order]21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 4th Street and Long Bridge Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jarrett Hornbostel, [staff email removed — see the order]21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
5 earlier
- ESTABLISH – TRAFFIC SIGNAL Alemany Boulevard and Cotter Street 22(b). RESCIND – RIGHT TURN ONLY Cotter Street, eastbound and westbound, at Alemany Boulevard (Supervisor District 11) (Approvable by the City Traffic Engine…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 41st Avenue and Lincoln Way 21(b). ESTABLISH – TRAFFIC ISLAND Lincoln Way center median island, from 41st Avenue to 15 feet easterly (extends existing median island west from its existing termi…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL Cesar Chavez Street and Florida Street 19(b). ESTABLISH – RED ZONE Florida Street, east side, from Cesar Chavez Street to 10 feet southerly (Supervisor District 9) (Approvable by the City Traff…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 10th Avenue and Lincoln Way (Approvable by the City Traffic Engineer) 16(b). ESTABLISH – CROSSWALK CLOSURE Crossing Lincoln Way, east side, at 10th Avenue (in conjunction with signalization of …21 Oct 2022 · Engineering hearing · Items 16(a) and 16(c) approved by the City Traffic Engineer for implementation. Item 16(b) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – TRAFFIC SIGNAL 4th Avenue and Fulton Street 15(b). ESTABLISH – RED ZONE 4th Avenue, west side, from Fulton Street to 10 feet northerly 15(c). ESTABLISH – TOW-AWAY, NO STOPPING EXCEPT PERMITTED CAR SHARE VEHIC…21 Oct 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
6 milestones and events from the project's own page
- ConstructionFall 2027 - Fall 2028 · Project page timeline · Pending
- Solicit Bids from ContractorsWinter 2026/27 - Summer 2027 · Project page timeline · Pending
- Board of Directors Meeting, December 16, 202516 Dec 2025 · Project page event
- Engineering Public Hearing Meeting, October 3, 20253 Oct 2025 · Project page event
- Board of Directors meeting, December 6, 20226 Dec 2022 · Project page event
- DesignFall 2022 - Fall 2026 · Project page timeline · Pending
19 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Fulton Street, south side, from 10 feet to 30 feet west of Pierce Street (Supervisor District 5) (Approvable by the City Traffic Engineer) Grant Brokl…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 10 feet to 30 feet south of Mission Rock Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email rem…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 17 feet to 40 feet north of Minna Street 8(b). ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Minna Street, south side, from 122 feet to 143 fe…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, east side, from 5 feet to 68 feet north of Quintara Street (63-foot station) (Supervisor District 4) (Approvable by the City T…20 Sep 2024 · Engineering hearing · Continued.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from 19 feet to 50 feet north of King Street (31-foot bike share station) (Supervisor District 6) (Approvable by the City Tra…14 Jun 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 17 feet to 40 feet north of Minna Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — s…19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by D’Arcy & Harty Construction, Inc for Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Street Brick Sewer Rehabilitation, for a total contract amount of $6,891,778, and with a total…9 May 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, west side, from 5 feet to 61 feet north of Irving Street (53-foot bike share station with red zones on each side of the station) (Superv…6 Jan 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – TRAFFIC SIGNAL 39th Avenue, Skyline Boulevard, and Sloat Boulevard (Supervisor Districts 4 and 7) (Approvable by the City Traffic Engineer) Corbin Skerrit, [staff email removed — see the order] A new traffic …23 Sep 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO RIGHT TURN ON RED 10th Avenue, northbound, at Fulton Street (Supervisor District 1) (Approvable by the City Traffic Engineer) Alison Mathews, [staff email removed — see the order]19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 41st Avenue, west side, from 5 feet to 61 feet north of Irving Street (53-foot bike share station with red zones on each side of the station) (Superv…18 Feb 2022 · Engineering hearing · Item withdrawn.
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Approve an increase of 30 consecutive calendar days to the contract duration contingency for Contract No. WW-703, Mission Street, 16th to Cesar Chavez Street, Brick Sewer Rehabilitation; and authorize the General Manager…14 Dec 2021 · SFPUC Commission · approve Consent Calendar items 10a through 10g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from Gene Friend Way to 103 feet northerly (92-foot bike share station with red zones on each side of the station) (Supervisor…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 4th Street, east side, from 103 feet to 144 feet south of Campus Way (Approvable by the City Traffic Engineer) 14(b). ESTABLISH - PASSENGER LOADING ZONE AT ALL TIMES 4th Str…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer to add subsection 14(c) for clarity and tor implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- Approving temporarily prohibiting the use of northbound 4th Street between Berry and Channel Streets by all vehicles other than transit, buses, bicycles, taxis, and emergency vehicles; directing the City Traffic Engineer…5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes
- ESTABLISH – NO LEFT TURN Fulton Street, eastbound, at 30th Avenue Fulton Street, eastbound, at 36th Avenue (Supervisor District 1) Dusson Yeung, [staff email removed — see the order] These changes are intended to improve…30 Oct 2020 · Engineering hearing · Approved, but will not be implemented at this time due to the Slow Street on Cabrillo. In the event the Slow Street on Cabrillo is still in active in 2022, SFMTA will implement the turn prohibition in 2022.
- Hearing of persons interested in or objecting to a Statutory Exemption by the Planning Department under the California Environmental Quality Act issued September 1, 2022, for the proposed Municipal Transportation Agency …Undated · Board of Supervisors · Killed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 6 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Golden Gate Park Traffic Safety ProjectSFMTA · Completed · 15 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side StreetsSFPUC · Design · 10 shared street segments
- Golden Gate Park Access and Safety ProgramSFMTA · Legislated · 7 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 7 shared street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 6 shared street segments
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 6 shared street segments
- Lincoln and Sloat Quick-Build Connections ProjectSFMTA · 6 shared street segments
- Great Highway Pilot ProjectSFMTA · Completed · 6 shared street segments
1 documents on the project page