Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Powell Street Promenade Refresh
No known overlap
SFMTA · Bike, walk or safety · Detailed Design · Under way, ends 31 Dec 2025
None of the project's street segments is on the Biking and Rolling Plan's network. It is listed because SFMTA tags the project Bike.
- Streets
- Powell St
- Planned bikeway
- Nothing on these street segments.
- Scope
- None published.
- Dates
Start End Public consultation 18 May 2017 28 Aug 2017 Construction 2024 2025 - Sources disagree
- The start date has passed (2024) while the phase is still Detailed Design, per SFMTA's project layer.
The published end date, 2025-12-31, has passed; SFMTA's project layer still gives it as Detailed Design. - Records
- SFMTA project page
City decisions naming this project
- Amending Transportation Code, to designate new transit-only lanes on Powell Street/parking and traffic modifications along Powell St between Ellis St and Geary St3 Mar 2020 · SFMTA Board · ADOPTED — 7 ayes
6 milestones and events from the project's own page
- Construction2024-25 · Project page timeline · Pending
- Detailed Design2023 · Project page timeline · Pending
- Board of Directors meeting, March 3, 20203 Mar 2020 · Project page event
- 4th Powell Streetscape Stakeholder Meeting28 Aug 2017 · Project page event
- 3rd Powell Streetscape Stakeholder Workshop31 Jul 2017 · Project page event
- Planning2017 - 2022 · Project page timeline · Completed
3 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Powell Street, west side, from 5 feet to 58 feet south of Green Street (Supervisor District 3) (Approvable by the City Traffic Engineer)16 May 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Powell Street, west side, from 27 feet to 87 feet north of Bay Street (55-foot bike share station and red zone) (Supervisor District 3) Laura Stonehi…7 Feb 2020 · Engineering hearing · On hold for further discussions with Fisherman’s Wharf Community Benefit District and bike rental companies. Public Comments: Comments received in opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Powell Street, east side, from Union Street to 56 feet northerly (bike share station in a back-to-back configuration in angled parking bay) (Supervis…1 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- Powell Street Improvement ProjectPublic Works · Design · 3 shared street segments
- MTA Powell Street Safety ProjectPublic Works · Construction · 2 shared street segments
- WD-2877 As Needed Water Main Replacement No.3SFPUC · Design · 2 shared street segments
- Various Locations Pavement Renovation No 80 and Sewer ReplacementPublic Works · Construction · 2 shared street segments
- Better Market StreetSFMTA · Current · 1 shared street segment
- Various Locations Large Diameter Sewer Replacement (JV w VL PR No 80)Public Works · Construction · 1 shared street segment
3 documents on the project page