Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 33
0% in published scope
Public Works · Sewer, water or power · Design · Starts 1 Jun 2028, ends 31 May 2029
2 of the project's 8 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th Ave, 24th Ave, 26th Ave, 2nd Ave, 6th Ave, Anza St
- Planned bikeway
- Shared street, 0.91 mi on Golden Gate Ave, Euclid Ave, Lake St, Cabrillo St
Bikeway of undecided type, 0.13 mi on 6th Ave - Would reach
- 439 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 1,278 residents with none within about one block (440 feet) today would have one; 1,060 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2687i”
- Dates
Start End Public consultation not published not published Construction Jun 2028 May 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
13 decisions on the same streets, not naming this project
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 24th Avenue, west side, from 10 feet to 73 feet north of Quintara Street (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 26th Avenue, west side, from Clement Street to 50 feet southerly (Supervisor District 1) (Approvable by the City Traffic Engineer) Daniel Mackowski, …18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by M Squared Construction, Inc., Contract No. WD-2692, 16-inch and 8-inch Ductile Iron Water Main Installation and Sewer Replacement on Geary Boulevard from 32nd to 48th Avenues, for a total contrac…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Accept work performed by JMB Construction, Inc. for Contract No. WW-674R, Geary Boulevard Sewer and Water Improvements; approve Modification No. 2 (final) decreasing the contract amount by $494,459, for a total contract …10 Aug 2021 · SFPUC Commission · approve Consent Calendar items 8a, 8b, and 8d
- All matters listed hereunder constitute a Consent Calendar, are considered to be routine by the San Francisco Municipal Transportation Agency Board of Directors and will be acted upon by a single vote. There will be no s…15 Jun 2021 · SFMTA Board · ADOPTED — 6 ayes
- Approve increase of $100,000 to the contract cost contingency, and increase of 70 calendar days to the contract duration contingency, for Contract No. WD- 2692, 16-Inch And 8-Inch Ductile Iron Water Main Installation, Se…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- ESTABLISH – CLASS II BIKEWAY A. Anza Street, eastbound, south side, between 30th Avenue and Parker Avenue (Requires approval of the SFMTA Board) B. Anza Street, eastbound, south side, between Blake Street and Masonic Ave…30 Apr 2021 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation after completion of environmental approval.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Anza Street, south side, from 157 feet to 206 feet west of crosswalk at Collins Street (bike share station with back-to-back plates) (Supervisor Dist…24 Jan 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Slow StreetsSFMTA · Construction · 4 shared street segments
- Golden Gate Park Traffic Safety ProjectSFMTA · Completed · 1 shared street segment
- Laurel Heights/Jordan Park Traffic Calming ProjectSFMTA · Implementation / Construction · 1 shared street segment
- Various Locations Pavement Renovation Under Overhead Contact System No 2Public Works · Planning · 1 shared street segment
- PEFWS Pipeline Contract E - 24-inch GGP CrossingSFPUC · Planning · 1 shared street segment
- PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving)SFPUC · Planning · 1 shared street segment
- Various Locations Pavement Renovation Under Overhead Contact System No 4Public Works · Planning · 1 shared street segment
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 1 shared street segment