Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Brannan Street Outfall Improvements
0% in published scope
Public Works · Sewer, water or power · Construction · Under way, ends 10 Nov 2026
3 of the project's 4 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Bay St, Brannan St, Chestnut St, Francisco St, Kearny St, Montgomery St
- Planned bikeway
- Separated bikeway, 0.99 mi on The Embarcadero
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction Feb 2026 Nov 2026 - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WW-793, Brannan Street Outfall Improvements, to the responsible bidder that submitted the lowest responsive bid, R&S Construction Management, Inc., in the contract amount of $3,318,205, with a contract…23 Sep 2025 · SFPUC Commission · approve the Consent Calendar
11 decisions on the same streets, not naming this project
- RESCIND – YELLOW METERED ZONE, COMMERCIAL LOADING, 30-MINUTE TIME LIMIT, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Kearny Street, west side, from 14 feet …14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Kearny Street, east side, from 15 feet to 32 feet south of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email remo…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Kearny Street, west side, from 12 feet to 100 feet north of Bush Street (Supervisor District 3) (Approvable by the City Traffic Engineer)4 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Chestnut Street, north side, from 24 feet to 104 feet east of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laura…3 Feb 2023 · Engineering hearing · Held pending the outcome of further stakeholder discussion.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 229 feet to 297 feet west of 7th Street (62-foot bike share station with red zone on western end) (Supervisor Distri…19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Montgomery Street, east side, from Pacific Avenue to 50 feet southerly (42-foot bike share station with red zones on either side) (Supervisor Distric…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Approve the plans and specifications, and award Contract No. WW-712, New Montgomery, Jessie, Minna, and Mission Streets Brick Sewer Rehabilitation, in the amount of $4,888,750, and with a duration of 390 consecutive cale…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 262 feet to 319 feet east of 6th Street (53-foot bike share station) 24(b). ESTABLISH – WHITE ZONE, PASSENGER LOADIN…12 Jun 2020 · Engineering hearing · On hold for further color curb analysis. # footnote applies to items 24(b) and 24(c). Public Comments: Comments received in opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 65 feet to 166 feet west of Colin P. Kelly Jr. Street (92-foot bike share station with red zones on either side) (Su…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Objection to expanding the station received.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Brannan Street, south side, from 89 feet to 155 feet west of 7th Street (62-foot bike share station with red zones on either side) (Supervisor Distri…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Ordinance ordering the summary street vacation of the 900 block of Francisco Street, generally bounded by Assessor’s Parcel Block No. 0046 to the north, Assessor’s Parcel Block No. 0047 to the south, Larkin Street to the…7 May 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
7 other projects on these street segments
- Northern Waterfront Electrical Improvements (NWEI)SFPUC · Planning · 3 shared street segments
- Train Control Upgrade Project - Phase 1Public Works · Design · 2 shared street segments
- Central Embarcadero Safety ProjectSFMTA · 2 shared street segments
- Brannan Street Safety ProjectSFMTA · Completed · 2 shared street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 1 shared street segment
- Front St and Sansome St Pavement RenovationPublic Works · Design · 1 shared street segment
- Stormwater Trash CapturePublic Works · Design · 1 shared street segment