Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 35
0% in published scope
Public Works · Sewer, water or power · Design · Starts 13 Mar 2028, ends 13 Sep 2029
3 of the project's 4 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 15th St, 19th St, 1st St, 20th St, 21st St, Bryant St
- Planned bikeway
- Separated bikeway, 0.36 mi on Potrero Ave, Golden Gate Ave
Shared street, 0.12 mi on 19th St - Would reach
- 2,226 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,635 residents, 1 school with none within about one block (440 feet) today would have one; 2,075 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “2688i”
- Dates
Start End Public consultation not published not published Construction Mar 2028 Sep 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
5 decisions on the same streets, not naming this project
- Approve an increase of 155 calendar days to the duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for SFPUC DECEMBER 10, 2024 MEETING MINUTES Page 6 of 1…10 Dec 2024 · SFPUC Commission · approve Item 13
- Approve an increase of 90 calendar days to the duration contingency and increase of $200,000 to the amount contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a…25 Jun 2024 · SFPUC Commission
- Approve an increase of 185 calendar days to the contract duration contingency for Contract No. WW-705, Various Locations Sewer Replacement No. 10, with Mitchell Engineering, for a new contract duration limit of up to 570…26 Mar 2024 · SFPUC Commission · approve items 6a through 6e
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Francisco Street, north side, from 23 feet to 112 feet east of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laur…3 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Various Locations Pavement Renovation No 86BPublic Works · Planning · 3 shared street segments
- Safer Taylor StreetSFMTA · Completed · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Various Locations Pavement Renovation XPublic Works · Planning · 1 shared street segment
- Various Locations Pavement Renovation No 80 and Sewer ReplacementPublic Works · Construction · 1 shared street segment
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 1 shared street segment
- Bryant Street Bike Network Improvement ProjectSFMTA · Completed · 1 shared street segment
- Contract 36 Traffic Signal ModificationsSFMTA · Implementation / Construction · 1 shared street segment