Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation No 85
0% in published scope
Public Works · Repaving · Construction · Under way, ends 31 May 2027
All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 40th Ave, Beulah St, Broderick St, Clayton St, Cole St, Frederick St
- Planned bikeway
- Shared street, 0.5 mi on Webster St, Greenwich St, Octavia St
- Would reach
- 189 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 2,594 residents, 1 school with none within about one block (440 feet) today would have one; 192 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “2410I”
- Dates
Start End Public consultation not published not published Construction Summer, 2026 Spring, 2027 - Sources disagree
- The coordination feed gives construction starting 2026-04-13; Public Works' project page (Start “Summer, 2026”; text “Summer, 2026”), 2026-07, which is shown.
The coordination feed gives construction ending 2027-02-06; Public Works' project page (Completion “Spring, 2027”; text “Spring, 2027”), 2027-05-31, which is shown. - Not yet checked
- The construction start shown, 2026-07, was read from the words “Summer, 2026” on Public Works' project page by a model, and a person has not confirmed it.
- Records
- Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Various Locations Pavement Renovation No. 85 and Sewer Replacement – Contract Award8 Jan 2026 · Public Works Commission
6 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Clayton Street, west side, from Waller Street to 20 feet northerly (in existing red zone) Waller Street, south side, from Clayton Street to 21 feet w…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Accept work performed by M. Squared Construction, Inc., under Contract No. WD- 2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street; approve Modification No. 3 (Final) dec…10 Nov 2025 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WD-2896, 12-Inch Ductile Iron Water Main Installation on Webster Street from Grove Street to Eddy Street, to the responsible bidder that submitted the lowest responsive bid, M. Squared Construction, In…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – SPEED TABLES Frederick Street, between Arguello Boulevard and Willard Street (2 speed tables) (Supervisor District 5) Mike Sallaberry, [staff email removed — see the order] This proposal installs traffic calm…13 Nov 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Greenwich Street, north side, from Franklin Street to 90 70 feet easterly (7270-foot bike share station with red zones on either side) (Supervisor Di…18 Oct 2019 · Engineering hearing · Approved by the City Traffic Engineer for implementation with modifications as noted above. Public Comments: Comments received in support and opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Frederick Street, north side, from Arguello Boulevard to 61 feet easterly, adjacent to the triangular island (53-foot station with red zones on eithe…16 Aug 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.
6 other projects on these street segments
- PW Various Locations Sewer Replacement (JV VL PR No 85)Public Works · Construction · 7 shared street segments
- Golden Gate Park Traffic Safety ProjectSFMTA · Completed · 2 shared street segments
- PW Various Locations Sewer Replacement (JV VL PR Concrete No 88)Public Works · Design · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 36Public Works · Design · 1 shared street segment
- Inner Sunset Streetscape Improvement ProjectSFMTA · Completed · 1 shared street segment