Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Pavement Renovation No 85

0% in published scope

Public Works · Repaving · Construction · Under way, ends 31 May 2027

All 6 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
40th Ave, Beulah St, Broderick St, Clayton St, Cole St, Frederick St
Planned bikeway
Shared street, 0.5 mi on Webster St, Greenwich St, Octavia St
Would reach
189 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 2,594 residents, 1 school with none within about one block (440 feet) today would have one; 192 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
“2410I”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionSummer, 2026Spring, 2027
Sources disagree
The coordination feed gives construction starting 2026-04-13; Public Works' project page (Start “Summer, 2026”; text “Summer, 2026”), 2026-07, which is shown.
The coordination feed gives construction ending 2027-02-06; Public Works' project page (Completion “Spring, 2027”; text “Spring, 2027”), 2027-05-31, which is shown.
Not yet checked
The construction start shown, 2026-07, was read from the words “Summer, 2026” on Public Works' project page by a model, and a person has not confirmed it.
Records
Public Works project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

6 decisions on the same streets, not naming this project

Construction on these street segments

202520262027202820292030todayVarious Locations Pavement Renovatio…PW As Needed Spot Sewer Replacement …Various Locations Sewer Replacement …PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026Various Locations Sewer Replacement No 36: construction 30 Jan 2028 to 1 Apr 2029Various Locations Pavement Renovation No 85: construction Jul 2026 to 31 May 2027Jul 2026 – 31 May 202722 Sep 2025 – 26 Oct 202630 Jan 2028 – 1 Apr 2029

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

6 other projects on these street segments