Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
8 & 12-Inch Ductile Iron Water Main Replacement on Palou, Quesada and Revere From 3rd St to Griffith St
0% in published scope
Public Works · Sewer, water or power · Construction · Under way, ends 4 Apr 2028
All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Griffith St, Jennings St, Keith St, Lane St, Quesada Ave
- Planned bikeway
- Shared street, 0.36 mi on Quesada Ave, Lane St
- Would reach
- 2,034 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 1,973 residents with none within about one block (440 feet) today would have one; 2,897 residents, 1 school with none within about two blocks (880 feet) today would have one
- Scope
- “2562i, WD-2921”
- Dates
Start End Public consultation not published not published Construction Apr 2026 Apr 2028 - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WD-2921, Water Main and Sewer Replacement on Palou, Quesada, and Revere Avenues from 3rd Street to Griffith Street, to the responsible bidder that submitted the lowest responsive bid, M Squared Constru…13 Jan 2026 · SFPUC Commission · approve the Consent Calendar
5 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Ordinance 1) ordering the street vacation of a portion of Griffith Street and a portion of Hudson Avenue, generally bounded by Assessor’s Parcel Block No. 4629A, Lot No. 010, a portion of Hudson Avenue at Assessor’s Parc…19 Jul 2022 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on Tuesday, July 12, 2022, at 3:00 p.m., to hold a public hearing on an Ordinance 1) ordering the street vacation of a portion of Griffith Street an…12 Jul 2022 · Board of Supervisors · Filed
- Resolution declaring the intention of the Board to order the vacation of 1) a portion of Griffith Street and a portion of Hudson Avenue, generally bounded by Assessor’s Parcel Block No. 4629A, Lot No. 010, a portion of H…7 Jun 2022 · Board of Supervisors · Passed
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 3rd Street, east side, from 390 feet to 420 feet north of 23rd Street (Supervisor District 10) (Approvable by the City Traffic Engineer) Pallavi Panyam, [staff email removed…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
5 other projects on these street segments
- WD-2921 8- and 12-inch Ductile Iron Water Main Replacement on Palou, Quesada, and Revere Ave from 3rd St to Griffith StSFPUC · Construction · 9 shared street segments
- Bayview Community Based Transportation PlanSFMTA · Planning · 4 shared street segments
- Bayview Multimodal ProjectPublic Works · Design · 3 shared street segments
- Various Locations Sewer Replacement No 24Public Works · Design · 3 shared street segments
- Bayview Community PathwaySFMTA · Planning · 1 shared street segment