252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 37
0% in published scope
Public Works · Sewer, water or power · Design · Starts 3 May 2028, ends 2 Nov 2029
1 of the project's 2 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 12th Ave, 15th Ave, 17th Ave, 18th Ave, 25th Ave, 26th Ave
- Planned bikeway
- Shared street, 0.3 mi on 12th Ave, Laguna Honda Blvd
- Scope
- “2690i”
- Dates
Start End Public consultation not published not published Construction May 2028 Nov 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
8 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 25th Avenue North, north side, from 6 feet to 30 feet east of driveway at 4 25th Avenue North (Supervisor District 1) (Approvable by the City Traffic …18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Grant Agreement No. PRO.0300 (G), Demonstration Garden Programming and Maintenance to Earth Island Institute, acting as the fiscal sponsor for Garden for the Environment, to operate a public demonstration garden an…11 Mar 2025 · SFPUC Commission · approve the Consent Calendar Item Nos. 6a, 6b, and 6c
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 15th Avenue, north side, from 5 feet to 67 feet west of Portola Drive (62-foot bike share station) (Supervisor District 7) (Approvable by the City T…22 Mar 2024 · Engineering hearing · Item withdrawn.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 26th Avenue, west side, from Clement Street to 50 feet southerly (Supervisor District 1) (Approvable by the City Traffic Engineer) Daniel Mackowski, …18 Aug 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase of 280 calendar days to the contract duration contingency for Contract No. WW-691, Sunset Boulevard Greenway – Phase II, Irving Street to Ulloa Street with Minerva Construction, Inc.; and authorize th…27 Apr 2021 · SFPUC Commission · approve Consent Calendar items 9a and 9b
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 18th Avenue, west side, from 241 feet to 310 feet north of California Street (62-foot bike share station with red zones on either side) (Supervisor D…21 Feb 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- ESTABLISH – SIDEWALK BIKE SHARE STATION 17th Avenue, east side, from 20 feet to 81 feet north of Geary Boulevard (60-foot bike share station) (Supervisor District 1) Laura Stonehill, [staff email removed — see the order]…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- PEFWS Pipeline Contract F- 24-Inch WaterSFPUC · Planning · 3 shared street segments
- N-JudahSFMTA · Planning · 2 shared street segments
- Various Locations Sewer Replacement No 30Public Works · Design · 2 shared street segments
- Judah St & 44th Aveother · Planning · 2 shared street segments
- WD-2877 As Needed Water Main Replacement No.3SFPUC · Design · 2 shared street segments
- WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side StreetsSFPUC · Design · 2 shared street segments
- PW Various Locations Sewer Replacement (JV VL PR No 69)Public Works · Construction · 1 shared street segment
- Lincoln Way Pavement RenovationPublic Works · Planning · 1 shared street segment