PW Various Locations Sewer Replacement (JV VL PR No 78)

0% in published scope

Public Works · Sewer, water or power · Design · Under way, ends 31 Mar 2027

The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
34th Ave, Ashbury St, Buchanan St, Cole St, Grove St, Oak St
Planned bikeway
Shared street, 0.27 mi on 34th Ave
Would reach
689 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 1,127 residents with none within about one block (440 feet) today would have one; 521 residents with none within about two blocks (880 feet) today would have one
Scope
“2350i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMar 2026March 2027
Sources disagree
The coordination feed gives construction ending 2027-06-12; Public Works' project page (Completion “Spring, 2027”; text “March 2027”), 2027-03-31, which is shown.
The start date has passed (2026-03-30) while the phase is still Design, per the coordination feed.
Records
Public Works project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

4 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029todayPW Various Locations Sewer Replaceme…Mission, 8th, 9th, Howard and Natoma…Various Locations Pavement Renovatio…Oak Street Quick-Build ProjectMission District Sewer Rehabilitatio…Mission, 8th, 9th, Howard and Natoma Brick Sewer Rehabilitation: construction 11 Aug 2025 to 31 Oct 2026Various Locations Pavement Renovation No 78: construction 30 Mar 2026 to 31 Mar 2027Oak Street Quick-Build Project: construction Jul 2026 to 30 Apr 2027Mission District Sewer Rehabilitation (VLLD2B): construction 7 Jun 2027 to 6 Jun 2028PW Various Locations Sewer Replacement (JV VL PR No 78): construction 30 Mar 2026 to 31 Mar 202730 Mar 2026 – 31 Mar 202711 Aug 2025 – 31 Oct 202630 Mar 2026 – 31 Mar 2027Jul 2026 – 30 Apr 20277 Jun 2027 – 6 Jun 2028

Construction start and end as each department publishes them; a dot where only one is published.

4 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.