Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Jefferson Street Quick-Build Project
Not stated
SFMTA · Bike, walk or safety · Planning · Starts 2027, ends 31 Dec 2027
All 8 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.
- Streets
- The Embarcadero, Jefferson St, Hyde St
- Planned bikeway
- Separated bikeway, 0.9 mi on The Embarcadero, Hyde St
Shared street, 0.55 mi on Jefferson St
Shared-use path, 0.12 mi on Jefferson St - Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 8 street segments that lack one. Closer in: 12 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction 2027 2027 - Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
4 milestones and events from the project's own page
- Final Construction2027 · Project page timeline · Pending
- Mid-term DesignWinter 2026/27 · Project page timeline · Pending
- OutreachOngoing · Project page timeline · Pending
- Near-term ImplementationOngoing · Project page timeline · Pending
7 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Beach Street, north side, from Divisadero Street to 20 feet easterly (in existing red zone) Divisadero Street, east side, from Beach Street to 21 fee…24 Jul 2026 · Engineering hearing · On hold.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Powell Street, west side, from 5 feet to 58 feet south of Green Street (Supervisor District 3) (Approvable by the City Traffic Engineer)16 May 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving various parking and traffic modifications along Beach Street between Van Ness Avenue and The Embarcadero to improve transportation safety and connectivity17 Dec 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 241217-146)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Francisco Street, north side, from 23 feet to 112 feet east of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laur…3 Feb 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Powell Street, west side, from 27 feet to 87 feet north of Bay Street (55-foot bike share station and red zone) (Supervisor District 3) Laura Stonehi…7 Feb 2020 · Engineering hearing · On hold for further discussions with Fisherman’s Wharf Community Benefit District and bike rental companies. Public Comments: Comments received in opposition.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Powell Street, east side, from Union Street to 56 feet northerly (bike share station in a back-to-back configuration in angled parking bay) (Supervis…1 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Ordinance ordering the summary street vacation of the 900 block of Francisco Street, generally bounded by Assessor’s Parcel Block No. 0046 to the north, Assessor’s Parcel Block No. 0047 to the south, Larkin Street to the…7 May 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
5 other projects on these street segments
- PW Various Locations Sewer Replacement No 13Public Works · Construction · 3 shared street segments
- Beach Street Quick-Build ProjectSFMTA · Implementation / Construction · 3 shared street segments
- Jefferson Streetscape Improvements Project - Phase IIPublic Works · In progress · 2 shared street segments
- Stormwater Trash Capture Phase 2Public Works · Planning · 2 shared street segments
- Stormwater Trash CapturePublic Works · Design · 1 shared street segment