Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Contract 35 Traffic Signal Modifications

Not stated

SFMTA · Bike, walk or safety · Detailed Design · Under way, ends 29 Feb 2028

25 of the project's 38 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA lists it as a bike project, but does not say whether it builds that bikeway.

Streets
San Jose Ave, Portola Dr, Sanchez St, Anza St, 6th Ave, Post St
Planned bikeway
Shared street, 2 mi on Sanchez St, Anza St, 30th Ave, Baker St
Separated bikeway, 1.6 mi on San Jose Ave, Portola Dr, Evans Ave, Market St
Bikeway of undecided type, 0.71 mi on 6th Ave, Post St
Level 3 shared street, 0.076 mi on 29th St
Would reach
4,532 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 25 street segments that lack one. Closer in: 5,568 residents with none within about one block (440 feet) today would have one; 5,814 residents with none within about two blocks (880 feet) today would have one
Scope
“Design and construct signal improvements at 23 intersections citywide to address safety or operational concerns. These locations have been selected primarily due to pedestrian safety concerns. Improvements will likely include installing new pedestrian countdown signals, installing new mast-arm signals to improve visibility, or implementing left-turn signals or other phasing improvements as-needed per review of a collision analysis.”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionAugust 2026Feb 2028
Sources disagree
The project page's timeline gives construction starting 2026-10; the page's text reports it started 2026-08 (“August 2026”), which is shown.
The coordination feed gives construction starting 2026-04-02; SFMTA's project page gives 2026-08, which is shown.
The start date has passed (2026-08) while the phase is still Detailed Design, per SFMTA's project layer.
SFMTA gives the phase as Detailed Design; the coordination feed gives Construction.
Records
SFMTA project page · Interagency coordination feed record (DataSF row)

City decisions naming this project

4 milestones and events from the project's own page

Construction on these street segments

20222023202420252026202720282029todayContract 35 Traffic Signal Modificat…Bayview Community Based Transportati…Better Market StreetBetter Market Street: construction Jan 2023 to 30 Apr 2025Bayview Community Based Transportation Plan: construction 2022 to end not publishedContract 35 Traffic Signal Modifications: construction Aug 2026 to 29 Feb 2028from 2022Jan 2023 – 30 Apr 2025Aug 2026 – 29 Feb 2028

Construction start and end as each department publishes them; a dot where only one is published. 6 other projects on these street segments publish no construction dates.

8 other projects on these street segments