252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Sewer Replacement No 13
0% in published scope
Public Works · Sewer, water or power · Construction · Under way, ends 31 May 2027
All 4 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Baker St, Bay St, Beach St, Bergen Aly, Columbus Ave, Francisco St
- Planned bikeway
- Shared street, 0.37 mi on Jefferson St
Shared-use path, 0.12 mi on Jefferson St
Car-free street, 0.064 mi on Marina Blvd - Would reach
- No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 4 street segments that lack one. Closer in: 12 residents (2020 census) with none within about one block (440 feet) today would have one
- Scope
- “WW-709, 1191i”
- Dates
Start End Public consultation not published not published Construction Feb 2023 May 2027 - Records
- SFPUC contract page (WW-709R Various Locations Sewer Replacement No. 13) · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Approve an increase of 545 calendar days to the existing duration contingency for Contract No. WW-709R14 Jul 2026 · SFPUC Commission · approve Item 13
- Approve an increase of 365 calendar days to the duration contingency for Contract No. WW-709R, Various Locations Sewer Replacement No. 13, with M. Hernandez Construction, Inc.10 Jun 2025 · SFPUC Commission · approve Item 9
- Approve an increase of 324 calendar days to the duration contingency for Contract No. WW-709R, Various Locations Sewer Replacement No. 13, with M. Hernandez Construction, Inc., for a revised contract duration limit (incl…25 Jun 2024 · SFPUC Commission
- Contract No. WW-709R, Various Locations Sewer Replacement No. 1311 Oct 2022 · SFPUC Commission
12 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Beach Street, north side, from Divisadero Street to 20 feet easterly (in existing red zone) Divisadero Street, east side, from Beach Street to 21 fee…24 Jul 2026 · Engineering hearing · On hold.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Columbus Avenue, east side, from North Point Street to 28 feet southerly (in existing red zone) Columbus Avenue, west side, from Leavenworth Street t…22 May 2026 · Engineering hearing · Corrected approval path. Approved by the City Traffic Engineer for implementation.
- Approving various parking and traffic modifications along Beach Street between Van Ness Avenue and The Embarcadero to improve transportation safety and connectivity17 Dec 2024 · SFMTA Board · ADOPTED — 6 ayes (Resolution 241217-146)
- RESCIND – CLASS III BIKE LANE Baker Street, southbound, from Fell Street to Oak Street 38(b). RESCIND – ANGLED PARKING ESTABLISH – PARALLEL PARKING Baker Street, west side, between Oak Street and Fell Street 38(c). ESTAB…8 Nov 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- RESCIND – CLASS III BIKE LANE Baker Street, southbound, from Fell Street to Oak Street 8(b). RESCIND – ANGLED PARKING ESTABLISH – PARALLEL PARKING Baker Street, west side, between Oak Street and Fell Street 8(c). ESTABLI…18 Oct 2024 · Engineering hearing · Item withdrawn by staff.
- Accept work performed by Pipe and Plant Solutions, Inc., under Contract No. WW-675, 5th/18th/Upper Larkin Street Sewer Inspection; approve Modification No. 2 (Final) decreasing contract amount by $10,000, for a total con…12 Mar 2024 · SFPUC Commission · approve the Consent Calendar
- Accept work performed by Trinet Construction, Inc. for Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair; approve Modification No. 1 (Final) decreasing the Contract amoun…23 Jan 2024 · SFPUC Commission · approve items 7a through 7i
- Approve an increase of $180,000 to the contract cost contingency, and an increase of 180 calendar days to the contract duration contingency, for Contract No. WW-675, 5th/18th/Upper Larkin Street Sewer Inspection; and aut…28 Feb 2023 · SFPUC Commission · approve Consent Calendar Items 6a through 6d
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION North Point Street, south side, from 9 feet to 93 feet east of Columbus Avenue (Supervisor District 3) (Approvable by the City Traffic Engineer) Laur…3 Feb 2023 · Engineering hearing · Held pending the outcome of further stakeholder discussion.
- Award Contract No. WW-737, Baker St. Combined Sewer Discharge Baffle Improvements & Backflow Valve Repair, in the amount of $566,000, and with a duration of 240 consecutive calendar days, to the responsible bidder that s…10 Jan 2023 · SFPUC Commission · Approve Consent Calendar Items 6a through 6j
- Approve an increase of $2,250,000 to the contract cost contingency, and an increase of 180 consecutive calendar days to the contract duration contingency for Contract No. WW-712, New Montgomery, Jessie, Minna, and Missio…8 Feb 2022 · SFPUC Commission · approve Item 10
- Ordinance ordering the summary street vacation of the 900 block of Francisco Street, generally bounded by Assessor’s Parcel Block No. 0046 to the north, Assessor’s Parcel Block No. 0047 to the south, Larkin Street to the…7 May 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Beach Street Quick-Build ProjectSFMTA · Implementation / Construction · 4 shared street segments
- Joint - Sewer Lead - Various Locations Sewer Replacement No 13 (WW-709)Public Works · Construction · 3 shared street segments
- Jefferson Street Quick-Build ProjectSFMTA · Planning · 3 shared street segments
- Jefferson Streetscape Improvements Project - Phase IIPublic Works · In progress · 1 shared street segment
- PW Various Locations Curb Ramps No 18Public Works · Construction · 1 shared street segment
- Various Locations Pavement Renovation No 86BPublic Works · Planning · 1 shared street segment
- PW Various Locations Sewer Replacement No 20Public Works · Design · 1 shared street segment
- WD-2877 As Needed Water Main Replacement No.3SFPUC · Design · 1 shared street segment