Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

PW Various Locations Sewer Replacement No 19

0% in published scope

Public Works · Sewer, water or power · Design · Starts 3 Mar 2027, ends 1 May 2028

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

1 of the project's 4 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
2nd Ave, 4th Ave, Anza St, Baker St, Beideman St, Broderick St
Planned bikeway
Shared street, 0.35 mi on Clay St, Cabrillo St, Anza St
Separated bikeway, 0.13 mi on Masonic Ave
Would reach
No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 212 residents (2020 census) with none within about one block (440 feet) today would have one
Scope
“2467i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionMar 2027May 2028
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

14 decisions on the same streets, not naming this project

Construction on these street segments

202620272028202920302031todayPW Various Locations Sewer Replaceme…PW StreetResurfacingPro-BBSR Pavemen…Hayes St, Fell St and Van Ness Ave P…PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Hayes St, Fell St and Van Ness Ave Pavement Renovation: construction 28 Mar 2029 to 10 Jun 2030PW Various Locations Sewer Replacement No 19: construction 3 Mar 2027 to 1 May 20283 Mar 2027 – 1 May 20281 Jul 2026 – 7 Jul 202728 Mar 2029 – 10 Jun 2030

Construction start and end as each department publishes them; a dot where only one is published. 6 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.