Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27

0% in published scope

Public Works · Repaving · Construction · Under way, ends 7 Jul 2027

15 of the project's 21 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
14th Ave, 15th Ave, 15th St, 16th Ave, 17th Ave, 18th Ave
Planned bikeway
Shared street, 2.8 mi on Mendell St, Jersey St, Seal Rock Dr, 15th Ave
Separated bikeway, 0.53 mi on Gellert Dr
Bikeway of undecided type, 0.12 mi on Steiner St
Would reach
8,158 residents (2020 census), 3 schools would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 15 street segments that lack one. Closer in: 7,417 residents, 1 school, 1 library with none within about one block (440 feet) today would have one; 10,280 residents, 1 school with none within about two blocks (880 feet) today would have one
Scope
None published.
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJul 2026Jul 2027
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

18 decisions on the same streets, not naming this project

Construction on these street segments

20222023202420252026202720282029todayPW StreetResurfacingPro-BBSR Pavemen…Bayview Community Based Transportati…Visitacion Valley and Portola Commun…WD-2923 (formerly WD-2764): 24-inch …Bayview Multimodal ProjectWD-2923 (formerly WD-2764): 24-inch Water Main Rehabilitation from University Mound Reservoir to 3rd St: construction 16 Dec 2024 to 1 Jun 2027Bayview Multimodal Project: construction 30 Jun 2027 to 31 Dec 2028Bayview Community Based Transportation Plan: construction 2022 to end not publishedVisitacion Valley and Portola Community Based Transportation Plan: construction start not published to 31 May 2023PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027from 2022until 31 May 20231 Jul 2026 – 7 Jul 202716 Dec 2024 – 1 Jun 202730 Jun 2027 – 31 Dec 2028

Construction start and end as each department publishes them; a dot where only one is published. 4 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.