Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
California Street Transit and Safety Project
0% in published scope
SFMTA · Bike, walk or safety · Planning · Starts Winter 2028; 2030 and 2031, ends 31 Dec 2028
1 of the project's 3 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's page for it names no bike work.
- Streets
- 8th Ave, Steiner St
- Planned bikeway
- Shared street, 0.51 mi on 8th Ave
Bikeway of undecided type, 0.033 mi on Steiner St - Would reach
- 724 residents (2020 census) would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 396 residents with none within about one block (440 feet) today would have one; 408 residents with none within about two blocks (880 feet) today would have one
- Scope
- None published.
- Dates
Start End Public consultation Summer 2026 Winter 2026/2027 Construction Winter 2028; 2030 and 2031 2028 - Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
8 milestones and events from the project's own page
- Full Construction2030 and 2031 · Project page timeline · Pending
- ImplementationWinter 2028 · Project page timeline · Pending
- SFMTA Board ApprovalFall 2027 · Project page timeline · Pending
- Proposal Development/OutreachWinter 2026/2027 · Project page timeline · Pending
- Presidio & California Morning Pop-Up29 Jul 2026 · Project page event
- Presidio Library Pop-Up25 Jul 2026 · Project page event
- Park Presidio and California Evening Pop-Up21 Jul 2026 · Project page event
- Listening/OutreachSummer 2026 · Project page timeline · Pending
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
2 other projects on these street segments
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 3 shared street segments
- 8th Avenue Neighborway ProjectSFMTA · Completed · 1 shared street segment