Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Lower Alemany Stormwater Improvements - Alemany Shaft
Already built
SFPUC · Sewer, water or power · Design · Under way, ends 30 Jun 2028
The project's one street segment on a planned bikeway street already has an all-ages bikeway.
- Streets
- Alemany Blvd
- Planned bikeway
- Separated bikeway, 0.25 mi on Alemany Blvd
- Scope
- “Existing utility as-built and map request on Alemany Blvd between Congdon and Stoneybrook”
- Dates
Start End Public consultation not published not published Construction Jun 2023 Jun 2028 - Sources disagree
- The coordination feed gives construction starting 2023-06-15; SFPUC's project page text gives 2027 (“Early 2027”).
The coordination feed gives construction ending 2028-06-30; SFPUC's project page text gives 2031 (“Early 2031”).
The start date has passed (2023-06-15) while the phase is still Design, per the coordination feed. - Records
- SFPUC project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Approve the selection of McMillen Jacobs Associates and award Agreement No. PRO.0164, Engineering Services to support SFPUC engineering services in the design of the proposed Lower Alemany Area Stormwater Improvement Pr27 Jul 2021 · SFPUC Commission · approve the Consent Calendar Item 9a
5 decisions on the same streets, not naming this project
- RESCIND – CLASS II BIKEWAY Alemany Boulevard, westbound, from Congdon Street to 520 feet easterly (on freeway overpass) (Requires approval by the SFMTA Board) 35(b). ESTABLISH – CLASS IV PROTECTED BIKEWAY Alemany Bouleva…8 Nov 2024 · Engineering hearing · Clarified approval path, location of 35(a), and 35(b) is a reclassification of an existing Class II facility to a Class IV facility. Items 35(b), 35(c) and 35(d) approved by the City Traffic Engineer for implementation. Item 35(a) approved by the City Traffic Engineer to forward to the SFMTA Board f
- ESTABLISH - CLASS IV BIKEWAY (TWO-WAY PROTECTED) Alemany Boulevard from Stoneybrook Ave/Cambridge Ave to Crescent Ave/Putnam Ave Installed a concrete barrier to protect the existing bikeway on Alemany Boulevard between S…8 Jan 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alemany Boulevard, east side, from 53 feet to 122 feet south of Francis Street (62-foot bike share station with red zones on either end) (Supervisor …12 Jun 2020 · Engineering hearing · On hold at the request of the District 11 Supervisor. Public Comments: Comments received in support and opposition.
- Resolution approving the First Amendment to the Freeway Maintenance Agreement between the City and County of San Francisco and the California Department of Transportation, to include City's maintenance of bicycle lanes a…9 Jun 2020 · Board of Supervisors · Passed
- ESTABLISH – NO PARKING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Alemany Boulevard, north side, from 100.5 feet to 159.5 feet east of Silver Avenue (52’-5” bike share station with red zones on end of the station) (S…6 Dec 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
3 other projects on these street segments
- Alemany Bikeway ProjectSFMTA · Completed · 1 shared street segment
- District 11-Wide Traffic Calming ProjectSFMTA · 1 shared street segment
- Excelsior Neighborhood Traffic Calming ProjectSFMTA · Completed · 1 shared street segment
How we built this: About the Data