Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Noe Slow Street and Duboce Triangle Planning Study
No known overlap
SFMTA · Bike, walk or safety · Planning · Under way, ends 30 Nov 2025
None of the project's street segments is on the Biking and Rolling Plan's network. It is listed because SFMTA tags the project Bike.
- Streets
- Beaver St, Castro St, Com With Noe St, Duboce Ave
- Planned bikeway
- Nothing on these street segments.
- Scope
- None published.
- Dates
Start End Public consultation Late fall 2025 Early spring 2026 Construction Summer - fall 2025 Nov 2025 - Sources disagree
- The project page's timeline gives construction starting 2025-07; the page's text gives 2020 (“2020”).
The start date has passed (2025-07) while the phase is still Planning, per SFMTA's project layer.
The published end date, 2025-11-30, has passed; SFMTA's project layer still gives it as Planning. - Records
- SFMTA project page
City decisions naming this project
- ESTABLISH – SPEED CUSHIONS Noe Street, between 14th Street and Henry Street (1 3-lump cushion) Noe Street, between 15th Street and Beaver Street (1 3-lump cushion) 5(b). RESCIND – GREEN ZONE ESTABLISH – RED ZONE Noe Stre…16 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
8 milestones and events from the project's own page
- Final planning study report publishedLate spring 2026 · Project page timeline · Pending
- Outreach to review draft planning studyEarly spring 2026 · Project page timeline · Pending
- Outreach to review existing conditions, define alternativesLate fall 2025 · Project page timeline · Pending
- Planning study existing conditions analysisLate summer - early fall 2025 · Project page timeline · Completed
- Traffic calming and painted safety zones implementedSummer - fall 2025 · Project page timeline · Completed
- Planning study alternatives analysisWinter 2025-26 · Project page timeline · Pending
- Engineering Public Hearing Meeting August 16, 202416 Aug 2024 · Project page event
- Permanent Slow Street establishedDecember 2022 · Project page timeline · Completed
9 decisions on the same streets, not naming this project
- ESTABLISH – RED ZONE A. Sanchez Street, west side, from 30th St to 16 feet northerly (for daylighting and Painted Safety Zone/6-foot island bulb) B. Sanchez Street, east side, from 30th Street to 20 feet northerly (for P…7 Mar 2025 · Engineering hearing · Clarified blue zone location for item 9(d)A. Approved by the City Traffic Engineer for implementation.
- ESTABLISH – RED ZONE A. Sanchez Street, west side, from 30th St to 16 feet northerly (for daylighting and B. Painted Safety Zone/6-foot island bulb) C. Sanchez Street, east side, from 30th Street to 20 feet northerly (fo…21 Feb 2025 · Engineering hearing · Item withdrawn by staff.
- ESTABLISH – RED ZONES Sanchez Street, east side, from Randall Street to 7 feet northerly Randall Street, north side, from Sanchez Street to 20 feet westerly (Supervisor District 8) (Approvable by the City Traffic Enginee…16 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- ESTABLISH – NO RIGHT TURN, EXCEPT BICYCLES Market Street, eastbound, at Church Street (Approvable by the City Traffic Engineer) 10(b). ESTABLISH – TYPE IV BIKE LANE Church Street, southbound, from Market Street to 200 fe…7 Jul 2023 · Engineering hearing · Item 10(a) approved by the City Traffic Engineer for implementation. Item 10(b) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Accept work performed by Cratus, Inc. under Contract No. WD-2739, Pavement Renovation, Sewer Replacement, and Water Main Replacement on Castro Street and 26th Street, for a total contract amount of $15,404,492, and with …27 Jun 2023 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH - SLOW STREET (NO THROUGH TRAFFIC) Sanchez Street, 23rd Street to 30th Street (Supervisor District 8) (Approvable by the City Traffic Engineer) Ariel Ward [staff email removed — see the order] Extends the class…3 Sep 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- Amending Transportation Code, Division II, Section 702 to reduce the speed limit on Market Street between Franklin Street and Steuart Street - designate a transit-only lane on Market Street RESCIND - RIGHT TURN ONLY, EXC…19 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes, 2 nays
- ESTABLISH – SIDEWALK BIKE SHARE STATION Steiner Street, east side, from 20 feet to 72 feet south of California Street (51-foot station) (Supervisor District 2) Laura Stonehill, [staff email removed — see the order] Propo…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
4 other projects on these street segments
- Slow StreetsSFMTA · Construction · 3 shared street segments
- Various Locations Pavement Renovation No 105Public Works · Planning · 2 shared street segments
- PW Various Locations Sewer Replacement No 16Public Works · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 29Public Works · Design · 1 shared street segment
How we built this: About the Data