8-Inch Ductile Iron Water Main Replacement on Harkness, Goettingen, Brussels, Girard Streets and Various Streets

0% in published scope

Public Works · Sewer, water or power · Design · Under way, ends 31 Aug 2027

The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
Alder St, Ankeny St, Delta St, Girard St, Hamilton St, Mansell St
Planned bikeway
Separated bikeway, 0.067 mi on Mansell St
Would reach
0 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 677 residents with none within about one block (440 feet) today would have one; 124 residents with none within about two blocks (880 feet) today would have one
Scope
“2561i, WD-2918”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionSep 2026Aug 2027
Sources disagree
The start date has passed (2026-09-01) while the phase is still Design, per the coordination feed.
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Water Main Replacement Process

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

Construction on these street segments

201920212023202520272029203120332035today8-Inch Ductile Iron Water Main Repla…San Bruno Ave Multimodal Improvement…Visitacion Valley and Portola Commun…PW As Needed Spot Sewer Replacement …PW StreetResurfacingPro-BBSR Pavemen…WD-2918 8-Inch Ductile Iron Water Ma…Various Locations Sewer Replacement …Various Locations Pavement Renovatio…Various Locations Pavement Renovatio…PW As Needed Spot Sewer Replacement No 47: construction 22 Sep 2025 to 26 Oct 2026PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27: construction 1 Jul 2026 to 7 Jul 2027WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various Locations: construction 13 Jul 2026 to 16 Feb 2029Various Locations Sewer Replacement No 25: construction 25 Feb 2027 to 31 Mar 2028Various Locations Pavement Renovation Concrete No 94: construction 1 Feb 2031 to 15 Apr 2032Various Locations Pavement Renovation Concrete No 97: construction 28 Feb 2034 to 14 May 2035San Bruno Ave Multimodal Improvement Project: construction 2019 to end not publishedVisitacion Valley and Portola Community Based Transportation Plan: construction start not published to 31 May 20238-Inch Ductile Iron Water Main Replacement on Harkness, Goettingen, Brussels, Girard Streets and Various Streets: construction 1 Sep 2026 to 31 Aug 20271 Sep 2026 – 31 Aug 2027from 2019until 31 May 202322 Sep 2025 – 26 Oct 20261 Jul 2026 – 7 Jul 202713 Jul 2026 – 16 Feb 202925 Feb 2027 – 31 Mar 20281 Feb 2031 – 15 Apr 203228 Feb 2034 – 14 May 2035

Construction start and end as each department publishes them; a dot where only one is published.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.