Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
8-Inch Ductile Iron Water Main Replacement on Harkness, Goettingen, Brussels, Girard Streets and Various Streets
0% in published scope
Public Works · Sewer, water or power · Design · Under way, ends 31 Aug 2027
The project's one street segment on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- Alder St, Ankeny St, Delta St, Girard St, Hamilton St, Mansell St
- Planned bikeway
- Separated bikeway, 0.067 mi on Mansell St
- Would reach
- 0 residents (2020 census), 1 school would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's street segment that lack one. Closer in: 677 residents with none within about one block (440 feet) today would have one; 124 residents with none within about two blocks (880 feet) today would have one
- Scope
- “2561i, WD-2918”
- Dates
Start End Public consultation not published not published Construction Sep 2026 Aug 2027 - Sources disagree
- The start date has passed (2026-09-01) while the phase is still Design, per the coordination feed.
- Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Water Main Replacement Process
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published.
8 other projects on these street segments
- WD-2918 8-Inch Ductile Iron Water Main Replacement, Sewer Rehabilitation and Sewer Replacement on Harkness Ave., Goettingen St., Girard St., and Various LocationsSFPUC · Design · 16 shared street segments
- Visitacion Valley and Portola Community Based Transportation PlanSFMTA · Planning · 11 shared street segments
- Various Locations Pavement Renovation Concrete No 97Public Works · Planning · 2 shared street segments
- PW StreetResurfacingPro-BBSR Pavement Prese FY 26-27Public Works · Construction · 1 shared street segment
- PW As Needed Spot Sewer Replacement No 47Public Works · Construction · 1 shared street segment
- Various Locations Sewer Replacement No 25Public Works · Design · 1 shared street segment
- San Bruno Ave Multimodal Improvement ProjectSFMTA · Implementation / Construction · 1 shared street segment
- Various Locations Pavement Renovation Concrete No 94Public Works · Planning · 1 shared street segment
How we built this: About the Data