Transbay Howard Streetscape Improvement Project
Builds 9%
SFMTA with Public Works · Bike, walk or safety · Implementation / Construction · Under way, ends 31 Dec 2028
1 of the project's 17 street segments on planned bikeway streets lacks the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 0.15 mi of the plan's bikeway.
- Streets
- Howard St, The Embarcadero
- Planned bikeway
- Separated bikeway, 1.9 mi on Howard St, The Embarcadero
- Scope
- “Transit, sidewalk, and roadway improvements on Howard Street from 4th Street to Embarcadero Street and Stuart Street from Howard Street to Mission Street as part of the Transit Center Soda program. 1297I”
- Dates
Start End Public consultation Spring - Fall 2022 2022-12-07 – 2022-12-21 Construction 2026 - 2028 Dec 2028 - Sources disagree
- The project page's timeline and event cards give the latest public consultation as 2022-12-21; the page's text gives 2025-10 (“fall 2025”).
The coordination feed gives construction starting 2025-10-15; SFMTA's project page gives 2026, which is shown.
The coordination feed gives construction ending 2028-10-18; SFMTA's project page gives 2028-12-31, which is shown.
Public Works' page gives its status as In progress; SFMTA's project layer gives Implementation / Construction.
SFMTA gives the phase as Implementation / Construction; the coordination feed gives Construction. - Records
- SFMTA project page · Public Works project page · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Transbay Howard Streetscape Project, Sourcing Event ID No: 0000003295, to Esquivel Grading & Paving, Inc. in the amount of $19,501,403.0824 Jul 2025 · Public Works Commission
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications between The Embarcadero and 4th Street to improve bike and pedestrian …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- RESCIND – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Howard Street, westbound, north side, between The Embarcadero and 4th Street (curbside bike lane with buffer and floating parking) 12(b). ESTABLISH – CLASS IV BIKEWA…2 Feb 2024 · Engineering hearing · Noted approval path. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
7 milestones and events from the project's own page
- Construction2026 - 2028 · Project page timeline · Completed
- Board of Directors meeting, April 16, 202416 Apr 2024 · Project page event
- Engineering Public Hearing Meeting, February 2, 20242 Feb 2024 · Project page event
- Project Approvals & Detailed Design2024-2025 · Project page timeline · Pending
- Environmental Review & Project ApprovalsWinter 2023 · Project page timeline · Pending
- Transbay Howard Streetscape Improvement Project Virtual Open House7 Dec 2022 · Project page event
- Outreach and DesignSpring - Fall 2022 · Project page timeline · Pending
22 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Beale Street, east side, from 5 feet to 155 feet south of Howard Street (in hatched area) (Supervisor District 6) (Approvable by the City Traffic Eng…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Spear Street, east side, from 48 feet to 146 feet south of Howard Street (Supervisor District 6) (Approvable by the City Traffic Engineer)16 Jan 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – YELLOW METERED ZONE, COMMERCIAL LOADING, 30-MINUTE TIME LIMIT, 7 AM TO 6 PM, MONDAY THROUGH FRIDAY ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Spear Street, east side, from 164 feet …11 Jul 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 10 feet to 30 feet south of Mission Rock Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email rem…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 17 feet to 40 feet north of Minna Street 8(b). ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Minna Street, south side, from 122 feet to 143 fe…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – BLUE ZONE 11th Street, west side, from 15 feet to 40 feet south of Folsom Street 11(b). ESTABLISH – GENERAL LOADING ZONE, 5 MIN, AT ALL TIMES, DAILY Folsom Street, south side, from 56 feet to 116 feet west of…2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from 19 feet to 50 feet north of King Street (31-foot bike share station) (Supervisor District 6) (Approvable by the City Tra…14 Jun 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving the two-way traffic conversion and parking changes on Steuart Street between Mission Street and Howard Street and Spear Street between Mission Street and Harrison Street16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-038)
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES Howard Street, south side, from 45 feet to 66 feet east of 2nd Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — …19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 17 feet to 40 feet north of Minna Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — s…19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 19 feet to 54 feet east of Grace Street (35-foot bike share station in floating parking lane) (Supervisor District 6)…4 Mar 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from Gene Friend Way to 103 feet northerly (92-foot bike share station with red zones on each side of the station) (Supervisor…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 4th Street, east side, from 103 feet to 144 feet south of Campus Way (Approvable by the City Traffic Engineer) 14(b). ESTABLISH - PASSENGER LOADING ZONE AT ALL TIMES 4th Str…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer to add subsection 14(c) for clarity and tor implementation. #
- Approving temporarily prohibiting the use of northbound 4th Street between Berry and Channel Streets by all vehicles other than transit, buses, bicycles, taxis, and emergency vehicles; directing the City Traffic Engineer…5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes
- Approving the following traffic modifications 102 A. ESTABLISH –TOW-AWAY, NO PARKING ANYTIME –Howard Street, north side, from Beale Street to 51 feet westerly5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes (Resolution 210105-002)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 165 feet to 239 feet east of 6th Street (74-foot bike share station) (Supervisor District 6) Project Contact: Laura S…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
- TWO-WAY PROTECTED BIKEWAY AND TRANSIT-ONLY LANE ESTABLISH – MUNI AND GOLDEN GATE TRANSIT ONLY LANE Beale Street, southbound, from Market Street to Natoma Street (converts general purpose lane from Market to Mission and r…13 Sep 2019 · Engineering hearing · Approved by City Traffic Engineer to send to SFMTA Board for legislation after environmental clearance has been obtained. Public Comments: Comments received in support.
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 3 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- Howard Street Quick-Build ProjectSFMTA · Completed · 11 shared street segments
- SF Bay Ferry Downtown Ferry Terminal Electrification Projectother · Design · 8 shared street segments
- The Embarcadero 2020 Quick-Build ProjectsSFMTA · Project Evaluation · 7 shared street segments
- Northern Waterfront Electrical Improvements (NWEI)SFPUC · Planning · 6 shared street segments
- Central Embarcadero Safety ProjectSFMTA · 6 shared street segments
- Contract 36 Traffic Signal ModificationsSFMTA · Implementation / Construction · 5 shared street segments
- Folsom-Howard Streetscape ProjectSFMTA · Current · 5 shared street segments
- Stormwater Trash CapturePublic Works · Design · 4 shared street segments