Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
23rd Avenue Slow Street
Builds 50%
SFMTA · Bike, walk or safety · Legislated · Under way, no end date published
All 6 of the project's street segments on planned bikeway streets already have an all-ages bikeway.
- Streets
- 23rd Ave, Cabrillo St
- Planned bikeway
- Shared street, 1.3 mi on 23rd Ave, Cabrillo St
- Scope
- None published.
- Dates
Start End Public consultation not published not published Construction 2021 not published - Records
- SFMTA project page
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
5 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING ANY TIME, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 23rd Avenue, east side, from 10 feet to 73 feet south of Sloat Boulevard (63-foot station) (Supervisor District 4) (Approvable by the City …20 Sep 2024 · Engineering hearing · Continued.
- Award Contract No. WW-743, Geary Boulevard Sewer and Water Improvements Phase 2, to the responsible bidder that submitted the lowest responsive bid, Cratus, Inc., in the amount of $45,957,035, and with a duration of 1,03…25 Jun 2024 · SFPUC Commission
- Accept work performed by M Squared Construction, Inc., Contract No. WD-2692, 16-inch and 8-inch Ductile Iron Water Main Installation and Sewer Replacement on Geary Boulevard from 32nd to 48th Avenues, for a total contrac…23 Nov 2021 · SFPUC Commission · approve Consent Calendar items 10a, 10c, 10d, and 10e
- Accept work performed by JMB Construction, Inc. for Contract No. WW-674R, Geary Boulevard Sewer and Water Improvements; approve Modification No. 2 (final) decreasing the contract amount by $494,459, for a total contract …10 Aug 2021 · SFPUC Commission · approve Consent Calendar items 8a, 8b, and 8d
- Approve increase of $100,000 to the contract cost contingency, and increase of 70 calendar days to the contract duration contingency, for Contract No. WD- 2692, 16-Inch And 8-Inch Ductile Iron Water Main Installation, Se…11 May 2021 · SFPUC Commission · approve Consent Calendar items 8c, 8d, and 8g
5 other projects on these street segments
- Slow StreetsSFMTA · Construction · 5 shared street segments
- Cabrillo Slow StreetSFMTA · 4 shared street segments
- Geary BRT Sewer Improvements Phase 2Public Works · Construction · 4 shared street segments
- PW Geary BRT Phase 2Public Works · Design · 4 shared street segments
- WD-2708: Geary Street Phase 2SFPUC · Construction · 2 shared street segments
1 documents on the project page