Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
PW Various Locations Sewer Replacement No 16
Already built
Public Works · Sewer, water or power · Construction · Under way, ends 9 Feb 2027
The project's one street segment on a planned bikeway street already has an all-ages bikeway.
- Streets
- 10th Ave, 16th St, 17th Ave, 17th St, 19th St, 20th St
- Planned bikeway
- Separated bikeway, 0.12 mi on Valencia St
- Scope
- “WW-727R, 2227i”
- Dates
Start End Public consultation not published not published Construction Sep 2025 Feb 2027 - Records
- SFPUC contract page (WW-727R Various Locations Sewer Replacement No.16) · Interagency coordination feed record (DataSF row)
City decisions naming this project
- Award Contract No. WW-727R, Various Locations Sewer Replacement No. 16, to the responsible bidder that submitted the lowest responsive bid, Michael O'Shaughnessy Construction, Inc., in the amount of $8,363,587, and with …13 May 2025 · SFPUC Commission · approve the Consent Calendar
- Award Contract No. WW-727, Various Locations Sewer Replacement No. 16, to the responsible bidder that submitted the lowest responsive bid, Precision Engineering, Inc., in the amount of $8,702,449 and with a duration of 5…25 Feb 2025 · SFPUC Commission · approve Consent Calendar Item Nos. 7a and 7c
11 decisions on the same streets, not naming this project
- ESTABLISH – GENERAL METERED PARKING, NO TIME LIMIT, 9AM TO 6PM MONDAY THROUGH SATURDAY Arkansas Street, both sides, from 16th Street to 200 feet southerly 7(b). ESTABLISH – RESIDENTIAL PERMIT PARKING AREA X (Eligibility …26 Jun 2026 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- RESCIND – GREEN METERED ZONE ESTABLISH – RED ZONE Parnassus Avenue, north side, from Cole Street to 21 feet easterly 9(b). ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Parnassus Avenue, north side, from 10 feet to 21…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WD-2844, 12-Inch Ductile Iron Water Main Installation on Parnassus Avenue, from Stanyan Street to 6th Avenue, on Lawton Street from 7th Avenue to Funston Avenue, and Various Street Locations, to the re…24 Sep 2024 · SFPUC Commission · approve the Consent Calendar
- Approve an increase in the amount of $450,000 to the cost contingency and an increase of 60 calendar days to the duration contingency for Contract No. WD-2843, 16-, 12-, and 8-Inch Ductile Iron Water Main Replacement on …14 May 2024 · SFPUC Commission
- Approving parking and traffic modifications along 17th Street between Potrero Avenue and Mississippi Street to improve transportation safety and connectivity5 Mar 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240305-020)
- Accept work performed by M Squared Construction, Inc., under Contract No. WD-2811, 8- Inch and 16-Inch Ductile Iron Water Main Replacement on 17th Street from Clayton Street to Douglass Street and Various Side Streets; a…9 Jan 2024 · SFPUC Commission · approve items 6a through 6i
- ESTABLISH – CLASS IV BIKEWAY 17th Street, eastbound and westbound, between Potrero Avenue and Mississippi Street (Approvable by the City Traffic Engineer) 4(b). ESTABLISH – STOP SIGNS 17th Street, eastbound and westbound…1 Sep 2023 · Engineering hearing · Item 4(a) corrected to reflect approvability by the City Traffic Engineer. Item 4(c) updated to TOW AWAY NO STOPPING ANY TIME as originally proposed. Items 4(a) through 4(s) approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO RIGHT TURN ON RED 10th Avenue, northbound, at Fulton Street (Supervisor District 1) (Approvable by the City Traffic Engineer) Alison Mathews, [staff email removed — see the order]19 Aug 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Fillmore Street, east side along median, from Jefferson Street to 53 feet southerly (bike share station in angled parking stalls) (Supervisor Distric…17 Jul 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. Public Comments: Received comments in support and opposition.
- ESTABLISH – SIDEWALK BIKE SHARE STATION 17th Avenue, east side, from 20 feet to 81 feet north of Geary Boulevard (60-foot bike share station) (Supervisor District 1) Laura Stonehill, [staff email removed — see the order]…18 Oct 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
- ESTABLISH – SPEED TABLES 17th Street, between Market Street and Diamond Street (2 speed tables) 17(b). ESTABLISH – CROSSWALK 17th Street, midblock between Diamond Street and Castro Street 17(c). ESTABLISH – CLASS IV BIKE…18 Oct 2019 · Engineering hearing · Approved by the City Traffic Engineer to send to SFMTA Board for legislation. Public Comments: Comments received in opposition.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 1 other project on these street segments publishes no construction dates.
8 other projects on these street segments
- Joint - MTA Lead - Fillmore St Pavement Renovation Phase 2Public Works · Planning · 8 shared street segments
- OShaughnessy and Woodside Ave Pavement RenovationPublic Works · Planning · 4 shared street segments
- Street Resurfacing Program- BBSR Paving FY 26-27Public Works · Construction · 3 shared street segments
- WW-779 Various Locations Sewer Replacement No. 32Public Works · Design · 3 shared street segments
- Various Locations Pavement Renovation Under Overhead Contact System No 4Public Works · Planning · 3 shared street segments
- WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side StreetsSFPUC · Design · 2 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 2 shared street segments
- Bikeway HardeningSFMTA · Planning · 2 shared street segments