Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Folsom-Howard Streetscape Project
Builds 55%
SFMTA · Bike, walk or safety · Current · Under way, ends 31 Dec 2029
7 of the project's 54 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. SFMTA's bikeway layer and project page show it building or upgrading 1.8 mi of the plan's bikeway.
- Streets
- Folsom St, Howard St, 11th St, 2nd St, 7th St, 8th St
- Planned bikeway
- Separated bikeway, 3.7 mi on Folsom St, Howard St, 11th St, 2nd St
- Scope
- None published.
- Dates
Start End Public consultation Winter 2016 to Summer 2019 16 Nov 2024 Construction 2024 to 2026; 2026 to 2029 Dec 2029 - Sources disagree
- The project page's timeline and event cards give the latest public consultation as 2024-11-16; the page's text gives 2026-05-15 (“May 15, 2026”).
- Records
- SFMTA project page · SFMTA project page (Folsom Street Implementation)
City decisions naming this project
- ESTABLISH – BLUE ZONE 11th Street, west side, from 15 feet to 40 feet south of Folsom Street 11(b). ESTABLISH – GENERAL LOADING ZONE, 5 MIN, AT ALL TIMES, DAILY Folsom Street, south side, from 56 feet to 116 feet west of…2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- Designating a transit only lane on Folsom Street and other environmental reviews and parking and traffic modifications in association with the Folsom-Howard Streetscape Project18 Jun 2019 · SFMTA Board · ADOPTED — 5 ayes
22 milestones and events from the project's own page
- Issue Contract and Notice to Proceed (Howard Streetscape Project - Detailed Design/Construction)2026 · Project page timeline
- Construction (Howard Streetscape Project - Detailed Design/Construction)2026 to 2029 · Project page timeline
- Howard Streetscape Project Open House16 Nov 2024 · Project page event
- Engineering Public Hearing Meeting, August 2, 20242 Aug 2024 · Project page event
- Folsom Streetscape Project - Pre-Construction Tabling Event2 May 2024 · Project page event
- Construction (Folsom Streetscape Project - Detailed Design/Construction)2024 to 2026 · Project page timeline
- Detailed Design (Howard Streetscape Project - Detailed Design/Construction)2024 · Project page timeline
- Issue Contract and Notice to Proceed (Folsom Streetscape Project - Detailed Design/Construction)2023 · Project page timeline
- Notice of Public Hearing: Tree Removals along Folsom Street13 Jan 2022 · Project page notice
- Long-Term Legislation (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Spring/Summer 2019 · Project page timeline
- Howard Near-Term Changes Installed (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Winter 2019 · Project page timeline
- Detailed Design (Folsom Streetscape Project - Detailed Design/Construction)2019 to 2022 · Project page timeline
- Howard Near-Term Legislation (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)October 2018 · Project page timeline
- Howard Near-Term Open Houses (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)July 2018 · Project page timeline
- Folsom Near-Term Changes Installed (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Winter 2018 · Project page timeline
- Proposed Alternative for Long-Term Changes Open Houses (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)January 2018 · Project page timeline
- Folsom Near-Term Public Hearing (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Fall 2017 · Project page timeline
- Folsom Near-Term Legislation (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Fall 2017 · Project page timeline
- Folsom Near-Term Open Houses (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)July 2017 · Project page timeline
- Community Values Open Houses (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)December 2016 · Project page timeline
- Community Outreach and Planning (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Winter 2016 to Summer 2019 · Project page timeline
- Predevelopment (Folsom-Howard Planning Phase/Quick-Build Projects/Legislation)Fall 2015 to Fall 2016 · Project page timeline
26 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 30 feet to 125 feet west of 1st Street (Supervisor District 6) (Approvable by the City Traffic Engineer)14 Nov 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-757R, Laguna, Howard, and Mission Creek Combined Sewer Discharge Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $7,296,786, wit…13 May 2025 · SFPUC Commission · approve the Consent Calendar
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 10 feet to 30 feet south of Mission Rock Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Grant Brokl, [staff email rem…18 Apr 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 17 feet to 40 feet north of Minna Street 8(b). ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES Minna Street, south side, from 122 feet to 143 fe…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, west side, from 35 feet to 87 feet north of 21st Street (52-foot station) (Supervisor District 9) (Approvable by the City Traffic Eng…7 Mar 2025 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – BLUE ZONE Harriet Street, east side, from Folsom Street to 25 feet northerly 12(b). ESTABLISH – GENERAL LOADING ZONE, 5 MIN, 11 AM-11 PM, DAILY Folsom Street, north side, from 39 feet to 59 feet, east of Moss…2 Aug 2024 · Engineering hearing · Corrected item numbering sequence. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – BLUE ZONE Folsom Street, south side, from 9 feet to 31 feet east of Mabini Street Folsom Street, south side, from 7 feet to 29 feet east of Hawthorne Street 10(b). ESTABLISH – METERED YELLOW ZONE, COMMERCIAL …2 Aug 2024 · Engineering hearing · Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 4th Street, west side, from 19 feet to 50 feet north of King Street (31-foot bike share station) (Supervisor District 6) (Approvable by the City Tra…14 Jun 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Approving Class IV protected bikeway on Howard Street between The Embarcadero and 4th Street; and approving various traffic and parking modifications ESTABLISH – LEFT LANE MUST TURN LEFT – Howard Street, westbound, from …16 Apr 2024 · SFMTA Board · ADOPTED — 7 ayes (Resolution 240416-044)
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 3rd Street, east side, from 42 feet to 116 feet south of the crosswalk at King Street (74-foot bike share station) (Supervisor District 6) (Approvab…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – NO STOPPING, EXCEPT BICYCLES RESCIND – BIKE SHARE STATION Folsom Street, north side, from 105 feet to 185 feet west of Main Street (80-foot bike share station) 12(b). ESTABLISH – NO STOPPING, EXCEPT BICYCLES ES…8 Mar 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- RESCIND – CLASS IV BIKEWAY (PARKING PROTECTED BIKEWAY) Howard Street, westbound, north side, between The Embarcadero and 4th Street (curbside bike lane with buffer and floating parking) 12(b). ESTABLISH – CLASS IV BIKEWA…2 Feb 2024 · Engineering hearing · Noted approval path. Approved by the City Traffic Engineer to forward to the SFMTA Board for final approval and implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES Howard Street, south side, from 45 feet to 66 feet east of 2nd Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — …19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH - NO PARKING ANY TIME, EXCEPT BICYCLES 4th Street, east side, from 17 feet to 40 feet north of Minna Street (Supervisor District 6) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email removed — s…19 May 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 19 feet to 54 feet east of Grace Street (35-foot bike share station in floating parking lane) (Supervisor District 6)…4 Mar 2022 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, north side, from 106 feet to 186 feet west of Main Street (73-foot bike share station with space on either end) 20(b). RESCIND – YELLO…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH - NO PARKING ANYTIME EXCEPT BICYCLES 4th Street, east side, from 103 feet to 144 feet south of Campus Way (Approvable by the City Traffic Engineer) 14(b). ESTABLISH - PASSENGER LOADING ZONE AT ALL TIMES 4th Str…4 Jun 2021 · Engineering hearing · Approved by the City Traffic Engineer to add subsection 14(c) for clarity and tor implementation. #
- Approving temporarily prohibiting the use of northbound 4th Street between Berry and Channel Streets by all vehicles other than transit, buses, bicycles, taxis, and emergency vehicles; directing the City Traffic Engineer…5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes
- Approving the following traffic modifications 102 A. ESTABLISH –TOW-AWAY, NO PARKING ANYTIME –Howard Street, north side, from Beale Street to 51 feet westerly5 Jan 2021 · SFMTA Board · ADOPTED — 5 ayes (Resolution 210105-002)
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 183 feet to 250 feet west of 2nd Street (66-foot bike share station) (Supervisor District 6) Pallavi Panyam, [staff e…16 Oct 2020 · Engineering hearing · Approved by the City Traffic Engineer for implementation. The Environmental Review citation, Case 2015-005492ENV, is accurate since temporary station installation and/or relocation are included in the bike share system.
- ESTABLISH – TRAFFIC SIGNAL 9th Street, Division Street, and San Bruno Avenue (Supervisor Districts 6 and 10) Corbin Skerrit, [staff email removed — see the order] The proposed modification would install a new traffic sig…4 Sep 2020 · Engineering hearing · Approved by the City Traffic Engineer to send to the SFMTA Board for approval and implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Howard Street, north side, from 165 feet to 239 feet east of 6th Street (74-foot bike share station) (Supervisor District 6) Project Contact: Laura S…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: No comments received.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Folsom Street, south side, from 41 feet to 92 feet west of 7th Street (51-foot bike share station in the floating parking lane) (Supervisor District …15 Nov 2019 · Engineering hearing · Approved by City Traffic Engineer for implementation. Public Comments: Comments received in support and opposition.
- Ordinance ordering the street vacation of the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including China Basin Park) and portions of Terry A. Francois B…10 Sep 2019 · Board of Supervisors · Passed
- Hearing of the Board of Supervisors sitting as a Committee of the Whole on September 3, 2019, at 3:00 p.m., to hold a public hearing to consider the proposed Ordinance (File No. 190654) ordering the street vacation of th…3 Sep 2019 · Board of Supervisors · Filed
- Resolution declaring the intent of the Board of Supervisors to order the street vacation for the entirety of Seawall Lot 337 (located east of Third Street between China Basin Channel and Mission Rock Street, including Ch…16 Jul 2019 · Board of Supervisors · Passed
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- PW Folsom Streetscape ProjectPublic Works · Construction · 20 shared street segments
- Joint - Streetscape Lead - Folsom St 10032072Public Works · Construction · 20 shared street segments
- Howard Streetscape ProjectPublic Works · Design · 16 shared street segments
- 7th Street and 8th Street Safety ProjectsSFMTA · Completed · 15 shared street segments
- Folsom Howard Streetscape Sewer ReplacementPublic Works · Construction · 14 shared street segments
- Folsom Street Quick-Build ProjectSFMTA · Completed · 8 shared street segments
- Transbay Howard Streetscape Improvement ProjectSFMTA · Implementation / Construction · 6 shared street segments
- 7th St, 8th St and Folsom St Pavement RenovationPublic Works · Planning · 5 shared street segments
6 documents on the project page
How we built this: About the Data