SF WorksMobility Improving The Bike Network Improving The Bike NetworkSafer School Trips Current Repaving Projects Other Bike PlansCurrent Repaving Projects

Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

Various Locations Pavement Renovation Under Overhead Contact System No 3

0% in published scope

Public Works · Repaving · Planning · Starts 28 Jan 2034, ends 13 Apr 2035

Early enough to change: Public Works gives its phase as Planning; its project page may list a contact. No meeting on it is posted for the next 60 days.

3 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
18th St, 30th St, Andover St, Banks St, Bay Shore Blvd, Bocana St
Planned bikeway
Separated bikeway, 0.26 mi on Bay Shore Blvd
Level 3 shared street, 0.12 mi on Bocana St
Shared street, 0.093 mi on 30th St
Would reach
1,938 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,349 residents with none within about one block (440 feet) today would have one; 2,278 residents, 1 library with none within about two blocks (880 feet) today would have one
Scope
“Various locations paving with OCS”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJan 2034Apr 2035
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

7 decisions on the same streets, not naming this project

Construction on these street segments

202520262027202820292030203120322033203420352036todayVarious Locations Pavement Renovatio…Bikeway HardeningWD-2919: 8- and 12-Inch Ductile Iron…Various Locations Spot Main Sewer Re…Bikeway Hardening: construction 1 Jul 2025 to 30 Jun 2027WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side Streets: construction 13 Apr 2026 to 9 Dec 2027Various Locations Spot Main Sewer Replacement No 2: construction 15 Mar 2027 to 12 Mar 2028Various Locations Pavement Renovation Under Overhead Contact System No 3: construction 28 Jan 2034 to 13 Apr 20351 Jul 2025 – 30 Jun 202713 Apr 2026 – 9 Dec 202715 Mar 2027 – 12 Mar 202828 Jan 2034 – 13 Apr 2035

Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.