Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Pavement Renovation Under Overhead Contact System No 3
0% in published scope
Public Works · Repaving · Planning · Starts 28 Jan 2034, ends 13 Apr 2035
3 of the project's 6 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 18th St, 30th St, Andover St, Banks St, Bay Shore Blvd, Bocana St
- Planned bikeway
- Separated bikeway, 0.26 mi on Bay Shore Blvd
Level 3 shared street, 0.12 mi on Bocana St
Shared street, 0.093 mi on 30th St - Would reach
- 1,938 residents (2020 census), 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 3 street segments that lack one. Closer in: 1,349 residents with none within about one block (440 feet) today would have one; 2,278 residents, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- “Various locations paving with OCS”
- Dates
Start End Public consultation not published not published Construction Jan 2034 Apr 2035 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Public Works paving map
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
7 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKESHARE STATION Cortland Avenue, north side, from Gates Street to 21 feet westerly (in existing red zone) Cortland Avenue, north side, from Gates Street to 23 feet e…24 Jul 2026 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WW-790, Evans Ave. and Mariposa St. Outfalls Improvements, to the responsible bidder that submitted the lowest responsive bid, Pullman SST, Inc., in the amount of $2,576,348, with a duration of 379 con…9 Sep 2025 · SFPUC Commission · approve the Consent Calendar
- Approve an increase in the amount of $2,500,000 to the cost contingency and an increase of 100 calendar days to the duration contingency for Contract No. WW-736, Castro and Mission Districts Sewer Improvements, with Prec…14 May 2024 · SFPUC Commission
- ESTABLISH – NO STOPPING, EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Cortland Avenue, south side, from 10 feet to 70 feet west of the crosswalk at Wool Street (57-foot bike share station with red zone) 5(b). ESTABLISH…5 Apr 2024 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO PARKING ANY TIME, EXCEPT BICYCLES 18th Street, north side, from 82 feet to 101 feet west of Guerrero Street (Supervisor District 8) (Approvable by the City Traffic Engineer) Jason Hyde, [staff email remove…8 Dec 2023 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- Award Contract No. WD-2801, 8- and 12-Inch Ductile Iron Water Main Replacement, 16- Inch Earthquake Resistant Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation, from Mariposa Street to Cesa…14 Feb 2023 · SFPUC Commission · approve Consent Calendar items 6a through 6h
- Hearing of persons interested in or objecting to the determination of exemption from environmental review under the California Environmental Quality Act issued as a Statutory Exemption by the Planning Department on June …13 Sep 2021 · Board of Supervisors · Filed without a hearing
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 5 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- 9 San Bruno Rapid ProjectSFMTA · Completed · 3 shared street segments
- Dogpatch-Central Waterfront Area Transit Connections StudySFMTA · Current · 3 shared street segments
- Alemany Interchange Bike Lanes ProjectSFMTA · Completed · 2 shared street segments
- WD-2919: 8- and 12-Inch Ductile Iron Water Main Replacement on 18th and Mariposa Streets from Potrero Ave. to Texas St. and on Various Side StreetsSFPUC · Design · 2 shared street segments
- WD-2934 16- and 8-inch Ductile Iron Water Main Replacement on Andover to Peralta from Tompkins to Cortland AveSFPUC · Design · 2 shared street segments
- Bikeway HardeningSFMTA · Planning · 2 shared street segments
- Various Locations Spot Main Sewer Replacement No 2Public Works · Design · 1 shared street segment
- Slow StreetsSFMTA · Construction · 1 shared street segment