Current Repaving Projects

252 street projects under way or coming up on the Biking and Rolling Plan's network.

← All projects

WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side Streets

0% in published scope

SFPUC · Sewer, water or power · Design · Starts 25 Jun 2028, ends 6 Nov 2029

Early enough to change: SFPUC gives its phase as Design; its project page may list a contact. No meeting on it is posted for the next 60 days.

All 2 of the project's street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
37th Ave, 38th Ave, 39th Ave, 40th Ave, 41st Ave, 42nd Ave
Planned bikeway
Shared street, 0.52 mi on 41st Ave, 47th Ave
Would reach
No one new would be within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 2 street segments that lack one. Closer in: 2,658 residents (2020 census) with none within about one block (440 feet) today would have one
Scope
“8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to 48th Ave and Various Side Streets”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionJun 2028Nov 2029
Records
Interagency coordination feed record (DataSF row) · No SFPUC page for this job; closest official source: Water Main Replacement Process

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

10 decisions on the same streets, not naming this project

Construction on these street segments

20252026202720282029203020312032todayWD-2922: 8-inch Ductile Iron Water M…Golden Gate Park Access and Safety P…Street Resurfacing Program- BBSR Pav…Various Locations Sewer Replacement …Contract 66 New Traffic SignalsLincoln Way New Traffic SignalsPEFWS Pipeline Contract C - 24-inch …Golden Gate Park Access and Safety Program: construction 1 Feb 2025 to 31 Dec 2028Street Resurfacing Program- BBSR Paving FY 26-27: construction 1 Jul 2026 to 7 Jul 2027Various Locations Sewer Replacement No 30: construction 12 Apr 2027 to 19 Jul 2028Contract 66 New Traffic Signals: construction Oct 2027 to 30 Nov 2028Lincoln Way New Traffic Signals: construction 1 Apr 2028 to 31 Mar 2029PEFWS Pipeline Contract C - 24-inch 42nd (between Lawton & Irving): construction 1 Jan 2029 to 31 Dec 2031WD-2922: 8-inch Ductile Iron Water Main Replacement on Lincoln Way from Sunset to La Playa St and Various Side Streets: construction 25 Jun 2028 to 6 Nov 20291 Feb 2025 – 31 Dec 20281 Jul 2026 – 7 Jul 202712 Apr 2027 – 19 Jul 2028Oct 2027 – 30 Nov 20281 Apr 2028 – 31 Mar 202925 Jun 2028 – 6 Nov 20291 Jan 2029 – 31 Dec 2031

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments