Current Repaving Projects
252 street projects under way or coming up on the Biking and Rolling Plan's network.
Various Locations Sewer Replacement No 38
0% in published scope
Public Works · Sewer, water or power · Design · Starts 28 Apr 2028, ends 30 Nov 2029
6 of the project's 7 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.
- Streets
- 19th Ave, Arballo Dr, Brighton Ave, Broadmoor Dr, Buckingham Way, Capitol Ave
- Planned bikeway
- Separated bikeway, 0.82 mi on Font Blvd, Winston Dr, Mercedes Way
Shared street, 0.34 mi on Gellert Dr, Junipero Serra Blvd
Level 3 shared street, 0.12 mi on Plymouth Ave - Would reach
- 2,554 residents (2020 census), 1 school, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 1,541 residents, 1 library with none within about one block (440 feet) today would have one; 2,107 residents, 1 library with none within about two blocks (880 feet) today would have one
- Scope
- “2691i”
- Dates
Start End Public consultation not published not published Construction Apr 2028 Nov 2029 - Records
- Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program
City decisions naming this project
None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.
3 decisions on the same streets, not naming this project
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION 230 Buckingham Way, east side, from 247 feet to 322 feet south of the midblock crosswalk at 270 Buckingham Way (75-foot bike share station in the par…5 Nov 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation. #
- ESTABLISH - NO STOPPING EXCEPT BICYCLES ESTABLISH - BIKE SHARE STATION Brighton Avenue, east side, from 11 feet to 68 feet south of Ocean Avenue (53-foot station with red zones either side) (Supervisor District 7) Daniel…19 Mar 2021 · Engineering hearing · Approved by the City Traffic Engineer for implementation.
- ESTABLISH – NO STOPPING EXCEPT BICYCLES ESTABLISH – BIKE SHARE STATION Arballo Drive, west side, from 115 feet to 195 feet north of Garces Drive (73-foot bike share station with red zones on either side) (Supervisor Dist…12 Jun 2020 · Engineering hearing · Approved by City Traffic Engineer for implementation.
Construction on these street segments
Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.
8 other projects on these street segments
- District 11-Wide Traffic Calming ProjectSFMTA · 8 shared street segments
- Various Locations Pavement Renovation No 68Public Works · Construction · 3 shared street segments
- Holloway Ave and Lake Merced Blvd Pavement RenovationPublic Works · Planning · 2 shared street segments
- Various Location Sewer Replacement No 22Public Works · Design · 2 shared street segments
- M Ocean View Transit and Safety ProjectSFMTA · Quick-Build Implementation and Detailed Design · 1 shared street segment
- Various Locations Pavement Renovation No 101Public Works · Planning · 1 shared street segment
- PEFWS Pipeline - 36- & 42-inch Welded Steel PipeSFPUC · Design · 1 shared street segment
- Muni Subway Expansion ProjectSFMTA · 1 shared street segment