Various Locations Sewer Replacement No 38

0% in published scope

Public Works · Sewer, water or power · Design · Starts 28 Apr 2028, ends 30 Nov 2029

Early enough to change: Public Works gives its phase as Design. No meeting on it is posted for the next 60 days.

6 of the project's 7 street segments on planned bikeway streets lack the all-ages bikeway the Biking and Rolling Plan calls for. Its published scope does not mention bikes.

Streets
19th Ave, Arballo Dr, Brighton Ave, Broadmoor Dr, Buckingham Way, Capitol Ave
Planned bikeway
Separated bikeway, 0.82 mi on Font Blvd, Winston Dr, Mercedes Way
Shared street, 0.34 mi on Gellert Dr, Junipero Serra Blvd
Level 3 shared street, 0.12 mi on Plymouth Ave
Would reach
2,554 residents (2020 census), 1 school, 1 library would be newly within a quarter-mile walk of an all-ages bikeway if the planned bikeway were built on the project's 6 street segments that lack one. Closer in: 1,541 residents, 1 library with none within about one block (440 feet) today would have one; 2,107 residents, 1 library with none within about two blocks (880 feet) today would have one
Scope
“2691i”
Dates
StartEnd
Public consultationnot publishednot published
ConstructionApr 2028Nov 2029
Records
Interagency coordination feed record (DataSF row) · No Public Works page for this job; closest official source: Sewer Upgrades: Renewal & Replacement Program

City decisions naming this project

None found in SFMTA engineering hearings, the SFMTA Board, the Board of Supervisors, the SFPUC Commission, the Public Works Commission, the SFCTA Board or the Recreation and Park Commission records read through 2026-09-30.

3 decisions on the same streets, not naming this project

Construction on these street segments

20242025202620272028202920302031203220332034todayVarious Locations Sewer Replacement …M Ocean View Transit and Safety Proj…PEFWS Pipeline - 36- & 42-inch Welde…Various Locations Pavement Renovatio…Various Location Sewer Replacement N…Various Locations Pavement Renovatio…Holloway Ave and Lake Merced Blvd Pa…M Ocean View Transit and Safety Project: construction Apr 2024 to 30 Nov 2025PEFWS Pipeline - 36- & 42-inch Welded Steel Pipe: construction 1 Apr 2024 to 1 Dec 2026Various Locations Pavement Renovation No 68: construction Nov 2024 to 30 Sep 2026Various Location Sewer Replacement No 22: construction 24 Aug 2026 to 24 Aug 2027Various Locations Pavement Renovation No 101: construction 28 Dec 2030 to 11 Mar 2032Holloway Ave and Lake Merced Blvd Pavement Renovation: construction 29 Aug 2032 to 12 Nov 2033Various Locations Sewer Replacement No 38: construction 28 Apr 2028 to 30 Nov 202928 Apr 2028 – 30 Nov 2029Apr 2024 – 30 Nov 20251 Apr 2024 – 1 Dec 2026Nov 2024 – 30 Sep 202624 Aug 2026 – 24 Aug 202728 Dec 2030 – 11 Mar 203229 Aug 2032 – 12 Nov 2033

Construction start and end as each department publishes them; a dot where only one is published. 2 other projects on these street segments publish no construction dates.

8 other projects on these street segments

Data Sources

Projects and city records

The Biking and Rolling Plan

The bike network

Who it reaches

How we worked out the project list is on About the Data.